Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />COST ALLOCATIONS <br /> <br />evaluated only for the Navajo unit and are estimated at $1,1351000 as the <br />present worth of $31,000 annually over 100 years at 2 1/2 peroent interest. <br />No estimate was made of the cost of the cheapest alternative means of pro- <br />viding flood control for consideration as the justifiable flood control <br />expenditure as the cost of suoh an alternative would far exceed the antici- <br />pated flood control benefits. <br /> <br />Results of AllooatioDs--Storage Project and Participating Projects <br /> <br />A summary of the derivation of the allocations made for the storage <br />project is sl10wn in the following table. Results of the allocations made <br />for the storage project and for the participating projeots are summarized <br />on page 43. <br /> <br />41 <br />