Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />SUMMARY OF PROCEDURE3 FOR ECONOMIC AND FINANCIAL ANALYSIS <br /> <br />(13) nverage rates of 6 mills per kilo"Btt-hour for firm energy a~d <br />2.5 mills per' kilO\latt-hour for nonfirm energy are used in this anal~'sis. <br />These rates are estimated to be required to return enough revenue to pay, <br />under the provisions of the authorizing act, the following construction <br />costs in addition to the annual operating costs: <br /> <br />(a) Costs allocated to power with interest, <br /> <br />(b) Storage unit costs allocated to irrigation without <br />interest, <br /> <br />(c) Costs of participating projects that are allocated <br />to irrigation end that are beyond the repayment <br />ability of the irrigators, ,nthout interest. <br /> <br />(14) Anticipated revenue collections from conservancy-type districts <br />are included as participating project revenues. <br /> <br />27 <br />