My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05696
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05696
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:30 PM
Creation date
10/12/2006 1:11:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.60
Description
Colorado River Storage Project (CRSP)
Basin
Colorado Mainstem
Date
2/1/1958
Author
USOID/BOR
Title
Financial and Economic Analysis, Colorado River Storage Project and Participating Projects
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />WATER SUPPLY <br /> <br />cOlHpl etion, ~uld start filling at the beginning of Fiscal Year 1963. <br />All the l'el"ervoirs would fill to reasonable operating levels by March 51, <br />1971, and the major part of the system pover output at the three storage <br />units would then be attained. An annual summary of the initial filling <br />operation for the Glen Canyon Reservoir with allowance for filling of <br />the storage project upstream reservoirs is shown on the following page. <br /> <br />The post-filling reservoir operation study was based on several <br />repetitions of a runoff cycle similar to the 32-year runoff period 1914 <br />to 1945. Data corresponding to the 32 years in sequence were inserted <br />in the study for Fiscal Year 1971 through Fiscal Year 2002 and the <br />process was repee,ted for each 32 years thereafter with proper adjust- <br />ments for increased depletions. A~ual releases for system energy <br />generation vere made in varying amounts in accordance with normal <br />operating and forecast procedures. The monthly pattern of releases for <br />energy generation folloved the pattern of energy requireoents estimated <br />for 1980 in the project power market areaY. Additional releases made <br />in anticipation of 1",-::e1' spLlls WSl"e a11"0 utili zed in the generation <br />of energy. <br /> <br />!/ Pattern of energy requirements was taken from preliminary data <br />for a power market survey that is being made by th1e Fed..ral Pmrer Com.- <br />mission for the Colorado River Storage pro.ject. <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.