My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05696
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05696
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:30 PM
Creation date
10/12/2006 1:11:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.60
Description
Colorado River Storage Project (CRSP)
Basin
Colorado Mainstem
Date
2/1/1958
Author
USOID/BOR
Title
Financial and Economic Analysis, Colorado River Storage Project and Participating Projects
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />PROJECT COSTS AND CONSTRUCTION SCHEDULE <br /> <br />are tentatively progr6Zlled as show in the schedule on the following page. <br />Construction already has been started on the principal features of the <br />Colorado River Storage project, except those of the Cureoanti unit. The <br />first participating projects programed are the Pllonia, Hammond, and Seed- <br />skadee projects and the Vernal unit of the Central Utah project, all of <br />whicb are scheduled for the start of conetruotion in F1soal Year 1961. <br /> <br />The advance planning and construotion schedule has been followed in <br />the economic and fin",.ncial analysis diso\1ssed later in this report. The <br />program as nO"1 outlined could be subetantially modified, however, as <br />actual progress will be determined by oongressional ~ppropriations. It <br />will be desirable for work on the storage project to follow the general <br />rate established by oontraots now in force and to be awarded in Fiscal <br />Year 1958. AIly slowdow in the rate established would increase costs <br />01' interest during construction and in the osee of the Glen Canyon and <br />Flaming Gorge units would delay ava1le.bllity of power revenues to assist <br />in repayment of irrigation costs. <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.