<br />PROJECT PLA!'l <br /> <br />e <br /> <br />Curecanti unit <br /> <br />The Curecanti unit will develop storage and power possibilities along <br />part or all of a 4o-mile stretch of a deep canyon section of the Gunnison <br />River above the Black Canyon of the Gunnison National Monument and below <br />the town of Gunnison, Colo. In order to prevent the inundation of land <br />near the town, the authorizing legislation provides that ". . . the Cure- <br />canti Dam (now called Blue r.fesa Dam) shall be constructed to a height <br />which "Till impound not less than 940,000 acre-feet of water or will cre- <br />ate a reservoir of such greater capacity as can be obtained by a high <br />waterline located at 7,520 feet above mean sea level. . ." The act also <br />requires that construction shall not be undertaken until further engineer- <br />ing and economic investigations have been made and until the Secretary of <br />the Interior has certified to the Congress and the President that in his <br />judgment the benefits 01' the un! t will exceed its costs. <br /> <br />. <br /> <br />Bureau of Reclamation reconnaissance studies indicate that a favor- <br />able plan, consistent with the authorizing act, would include a series of <br />four dams, reservoirs, powerplants, and s\o11 tchyards . The developments in <br />order moving downstream would be !maim as the Blue Mesa, Narrow Gauge, <br />r.10rrow Point, and Crystal. Collectively the reservoirs would have a capac- <br />ity of about one million acre-feet. The powerplants, with an installed <br />generating capacity of about 159,000 kilowatts, would develop a maximum <br />of about 940 feet of static povTer head. <br /> <br />The Blue Mesa Dam, located 30 miles downstream from Gunnison, would <br />be the largest of the series in the Curecanti unit. It ,{ould be an earth- <br />fill structure about 350 feet high above its foundation and about 820 beet <br />long at its crest. The reservoir ,",ould have a capacity of about 940,000 <br />acre-feet at a high water elevation of 7,520 feet. About 200,000 acre- <br />feet of the reservoir capacity would be inactive. The active capacity <br />would provide the principal seasonal river regulation for the unit power- <br />plants. Recreational facilities would be provided at the reservoir. <br /> <br />Investigation and planning of the Curecanti unit are continuing in <br />more detailed scope as required by the authorizing act. <br /> <br />Transmission division <br /> <br />The authorizing act of April 11, 1956, provides that project power- <br />plants and transmission facilities shall be operated in oonjunction with <br />other Federal powerplants, present and potential, so as to produce the <br />greatest practicable amount of power and energy that can be sold at firm <br />power and energy rates. To carry out the provisions of the law, a high <br />voltage transmission grid will be constructed to interconnect the plants of <br />the authorized units of the storage project and to effect interconnection <br />with other existing Federal. powerpJ.ants and utility systems in the area.. <br /> <br />e <br /> <br />6 <br />