Laserfiche WebLink
<br />. <br /> <br />on1"o'sz <br /> <br />r. <br /> <br />'- <br /> <br />( <br /> <br />CHAPrER IV <br /> <br />('IA'fER SUPPLY <br /> <br />Water Utilization <br /> <br />Preproject Yater supply <br /> <br />Prior to construction of any features of the Paonia project, land" <br />aestined to be included in the project's Fire ~buntain division received <br />irrigation water froi;1 the North Fork River and trJ,butary streams inter- <br />cepted by the Fire l>buntain Canal end from Leroux Creek including vater <br />conveyed to Leroux Creek by the Upper Overland ditch. Lands in the east- <br />ern part of the diviaion were served only from the Fire lI.ountain Canal <br />wbile those in the western part were served only from Leroux Creek. An <br />intermediate area located on both sides of Leroux Creek received water <br />from both sources. For en analysis of the preproject water supply, lands <br />of the Fire Mountain division are segregated into an area east of Leroux <br />Creek and an area west of Leroux Creek. <br /> <br />, The preproject supply for lands in the Leroux Creek division ''''s <br />obtained entirely from Leroux Creek but included importations to that <br />stream. <br /> <br />ce <br /> <br />( <br /> <br />The following tabulation summarizes preproject conditions including <br />average annual demands, supplies within ideal demand, and shortages. <br /> <br /> Preproject water supply <br /> Ideal Average <br /> annual Bl'lIlual Average annual <br /> demand supply shortage <br /> . (acre- feet (acre-feet (acre-feet (percent of <br /> Division and area per acre) per acre) per acre) ideal demand) <br /> Fire lI.ountain division <br /> Lands East of <br /> Leroux Creek <br /> (Productive area <br /> of 2,900 acres) 4.28 3.74 o. :,4 12."; <br /> Lands ~Iest of <br />~ Leroux Creek <br />(Produc1;ive area <br />.t.-':' of 4,870 acres) 4.28 2.81 1.4'; )4.) <br />;~r, <br /> Leroux Creek division <br /> (Productive area of <br /> 4,510 acres) 3.b8 2.63 1.05 28.6 <br /> <br /> <br />Project WIlter supply <br /> <br />Fire ttluntain Division. <br /> <br />eeL <br /> <br />The amount of wate~ that will Oe avai~aole to the Fire i10untain <br />1ivision under project. operation was determined by reservoir operatioll <br /> <br />31 <br />