My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05671
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:23 PM
Creation date
10/12/2006 1:11:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.112.A
Description
Dallas Creek Participating Project
State
CO
Basin
Gunnison
Water Division
4
Date
5/1/1975
Title
Dallas Creek Project Slide Presentation for the Colorado Water Conservation Board Meeting of May 1-1975 (text only)
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(28) HERE IS ANOTHER VIEW OF POTENTIAL FARM LAND. SURROUND- <br />ING THIS FARMSTEAD ARE FIELDS OF IRRIGATED CROPS) DRY LAND <br />WHEAT) AND AREAS OF NATIVE PINON-JUNIPER COVER. <br />(29) THIS IS ONE OF THE ABANDONED FARMSTEADS ON THE MESA <br />TYPIFYING THE PROBLEMS RESULTING FROM THE LACK OF WATER IN <br />THE AREA. <br />(30) SHOWN HERE IS A CLOSE UP VIEW OF SOME OF THE PINON- <br />JUNIPER LANDS USED FOR LIVESTOCK GRAZING AND DEER RANGE. <br />(31) THIS LOG HILL MESA LAND HAS BEEN CHAINED AND PLANTED <br />TO CRESTED WHEATGRASS. <br />(32) THIS LAND HAS ALSO BEEN CHAINED BUT LEFT IN NATIVE <br />GRASS. BOTH OF THESE AREAS WOULD RECEIVE PROJECT WATER UNDER <br />THE PRESENT PLAN. <br />(33) THIS MOBILE HOME IS PART OF THE RESIDENTIAL DEVELOPMENT <br />TAKING PLACE ON LOG HILL MESA. THE FIELD IN THE FOREGROUND <br />IS IRRIGATED IN EARLY SPRING BUT LACKS AN ADEQUATE WATER SUPPLY <br />LATER IN THE GROWING SEASON. <br />(34) THE PART OF LOG HILL MESA SHOWN HERE) ON THE RIGHT) <br />IS THE AREA TO BE DEVELOPED BY LOGHILL MESA COMMUNITY) WHICH <br />WOULD RECEIVE PROJECT WATER. To THE LEFT WOULD BE THE DAM AXIS <br />FOR RIDGWAY RESERVOIR. A DAM AT THIS LOCATION WOULD CREATE <br />A RESERVOIR IN THIS GENERAL AREA. THE RESERVOIR WOULD <br />NORMALLY FILL IN JUNE AND REACH ITS LOW POINT THE FOLLOWING <br />MARCH. HIGHWAY 550 WOULD BE RELOCATED EAST OF THE RESERVOIR) <br />AND IT IS CONTEMPLATED THE RAILROAD WOULD BE ABANDONED. PROJECT <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.