My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05654
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:19 PM
Creation date
10/12/2006 1:10:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
1/1/1939
Title
Period of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> APPENDJX E <br /> Diversion demand <br /> Study 12 <br />Year (Acre-Fe <br />1931 598,900 345,000 566,600 32,300 5.3 <br />1934 606,200 318,300 503,900 3.02,300 16.9 <br />1935 623,000 721,900 606,500 16,500 2.7 <br />1936 600,600 489,300 470,900 129,700 21.6 <br />1940 613 ,400 301,700 337,100 276,300 45.1 <br />1941 601,500 696,800 567,200 34,300 5.7 <br />1946 618,000 432,500 601,900 16,100 2.6 <br />1951 619.700 ~~.700 392.100 227.600 37.8 <br /> OPERATION STUDY 1200R <br /> <br /> <br /> <br />( <br />, <br /> <br />The operation stud..~ used in this report has been designated as <br />Study 12-R. This stud;' cOlJlbines the operation of the Viagon \Theel Gap <br />Reserv-oir, with a total capacity of 500,000 acre-feet allocated as <br />previously described for irr-ig8,tion, for neod control in Colorado am <br />Newl!exico, am for cOLlpliance with the terlJS of tIle Rio Grame COIUp:lct. <br />The major difference 'betrreen Studies 12 am 12-R is that in Study 12..R <br />the content of Wagon Wheel Gap reservoir at the beginning of celemar <br />year 1925 was zero, wlUJ.e in Study 12, tIle starting content was 241,000 <br />acre-feet. The startinc content of zero was used in study 12-R to deter- <br />mine the effects of bec;innine the reserv-oir operation during a dry cycle" <br />such as has been e::perienced in the Rio Gran:le Basin during recent years. <br /> <br />( <br /> <br />Run-off' at Wuon Wheel Gap Dam SJ;a, <br /> <br />The monthly n-QV1S at Wagon Wheel Gap Dam site were estimated as <br />flplrcentage of the news at the Wason gaging station, which lies within <br />the reservoir area and five miles above the dam site. Eighty square miles <br />of drainage area are tributlll.7 to the Rio Grame bet\78en Wagon Wheel Gap <br />Dam site and the Wason gaging stationo <br /> <br />"<" "Ait~~ the 'IllC>nbl:lly "~icm~ fo~' Wa~on Wheel G"a!> 'we're estil!at~.~ ill <br />was necessary" to estimate the daily fi0\7S at Wagon Wheel Gap for parts of <br />the years.. These daily fl0\7s were used in computing the innow between <br />Wagon Wheel Gap am Del Norte am for need control studies. To estimate <br />the daily news at Wagon Wheel Gap, the Wagon Wheel Gap monthly now was <br />divided by the Wason montbJ,y 1'low and this factor was applied to the Wason <br />daiJ.y nOlJS for that month,," <br /> <br />.- <br /> <br />'f' <br />. <br />, - <br />L-___~ <br /> <br />W9 <br /> <br />,... ",; :"":- (" :'''": <br />\.:_... ~_vl.&d <br />
The URL can be used to link to this page
Your browser does not support the video tag.