My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05619
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:10 PM
Creation date
10/12/2006 1:09:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.500
Description
Coordinator Long Range Reservoir Operations
Basin
Colorado Mainstem
Date
1/1/1968
Author
USDOI/BOR
Title
Criteria for Coordinated Long-Range Operation of Colorado River Reservoirs Pursuant to the Colorado River Basin Project Act of September 30, 1968
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />Lake Powell at a rate greater than 8.23 million 'acre-feet per <br /> <br />year to the extent necessary to accomplish any or all of the <br /> <br />following objectives: <br />(a) to the extent it can be reasonably applied in the <br />States of the Lower Division to the uses specified in <br />Article III (e) of the Colorado River Compact, but no such <br />releases shall be made when the active storage in Lake Powell <br />is less than the active storage in Lake Mead, <br />(b) to maintain, as nearly as practicable, active storage <br /> <br />in Lake Mead equal to the active storage in Lake Powell, and <br /> <br />(c) to avoid anticipated spills from Lake Powell. <br /> <br />(4) In the application of Article 11(3)(b) herein, the annual <br />release will be made to the extent that it can be passed through <br />Glen Canyon Powerplant when operated at the available capability <br />of the powerplant. Any water thus retained in Lake Powell to <br />avoid bypass of water at the Glen Canyon Powerplant will be <br />released through the Glen Canyon Powerplant as soon as practicable <br />to equalize the active storage in Lake Powell and Lake Mead. <br /> <br />(5) Releases from Lake Powell pursuant to these criteria shall <br /> <br /> <br />not prejudice the position of either the Upper or I,~e~ basin <br /> <br /> <br />interests with respect to required deliveries at Lee Ferry pursuant <br /> <br /> <br />to the Colorado River Compact. <br /> <br />III. OPERATION OF LAKE MEAD <br /> <br /> <br />(1) Water released from Lake Powell, plus the tributary inflows <br /> <br /> <br />between Lake Powell and Lake Mead, shall be regulated in Lake Mead <br /> <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.