Laserfiche WebLink
<br />.. ;-;~ ;',;",e,'!..' <br /> <br />.-, .--- <br />., ...__.~.~-t:,..:',"<<~Ui".'--"'" ..._"'..." ~.:,,:'__.<...' ~'..'" ~ <br /> <br />.' _ =": ,.-~~~, _d " <br /> <br />13 <br /> <br /> <br />L"" <br />....J4 <br />'i,iO <br /> <br />j <br /> <br />RIO GRANDE COMPACT COMMISSION REPORT <br /> <br />DISCHARGE OF RIO GRANDE AT OTOWI BRIDGE AND ELEPHANT BUTTE EFFECTIVE <br />SUPPLY <br />Quantities In thousands of acre-feet <br /> <br />Elephant Butte Effective Index <br />Supply (6) <br /> <br />57 <br />114 <br />171 <br />228 <br />286 <br />345 <br />406 <br />471 <br />542 <br />621 <br />707 <br />800 <br />897 <br />996 <br />1,095 <br />1,195 <br />1,295 <br />1,395 <br />1,495 <br />1.595 <br />1,695 <br />1,795 <br />1,895 <br />1,995 <br />2,095 <br />2,195 <br />2,295 <br />2,395 <br />2,495 <br />2,595 <br /> <br />"-'. <br /> <br />'_J <br /> <br />, -, <br />~~.-=' <br /> <br />Otowi Index Supply (5) <br /> <br />100 <br />200 <br />300 <br />400 <br />500 <br />600 <br />700 <br />800 <br />900 <br />1,000 <br />1,100 <br />1.200 <br />1,300 <br />1,400 <br />1,500 <br />1,600 <br />1,700 <br />1,800 <br />1,900 <br />2,060 <br />2,100 <br />2,200 <br />2,300 <br />2,400 <br />2,500 <br />2,600 <br />2,700 <br />2,800 <br />2,900 <br />3,000 <br /> <br />Intennedlate quantities shall be computed by proportional parts. <br /> <br />(5) The Otowi Index Supply Is the recorded flow of the Rio Grande at the U.S.G.S. <br />gaging stallon at Otowi Bridge near San IIdefonso (fonnerly station near Buck- <br />man) during the calendar year, corrected for the operation of reservoirs con- <br />structed after 1929 In the drainage basin of the Rio Grande between Lobatos <br />and Otowi Bridge. <br /> <br />(6) Elephant Butte Effective Index Supply Is the recorded flow of the Rio Grande <br />at Ihe gaging station below Elephant Butte Dam during the calendar year plus <br />the net gain In storage In Elephant Butte Reservoir during Ihe same year or <br />minus the net loss In storage In said reservoir, as Ihe case may be. <br /> <br />The appllcallon of this schedule shall be subject 10 the provisions hereinafter <br />set forth and appropriate adjustments shall be made for (a) any change In loca- <br />tion of gaging stations; (b) depletion after 1929 In New Mexico of Ihe natural <br />runoff at Otowi Bridge; and (c) any transmountain diversions Into the Rio <br />