My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05601
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:04 PM
Creation date
10/12/2006 1:08:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.126.A
Description
San Miguel Project
State
CO
Basin
San Juan/Dolores
Water Division
4
Date
3/1/1976
Title
CWCB: San Miguel Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />~ <br />~ <br /> <br />. <br /> <br />. <br /> <br />Municipal and industrial water would be made available in the <br />San Miguel River and in the Naturita and Radium Reservoirs. The <br />industrial water would be used to develop the natural resources of <br />the area which include coal. oil. potash. gypsum. timber. uranium. <br />vanadium. copper. lead. zinc, silver and gold. It is anticipated <br />that 20.000 acre-feet per year will be needed by 1980 and 44.000 <br />acre-feet by 1990. Recreational facilities would be provided at <br />the three project reservoirs. The Saltado Reservoir would be oper- <br />ated for flood control on the basis of runoff forecasts. Measures <br />for fish and wildlife would include maintenance of minimum flows <br />and channel improvements in the river below Saltado Reservoir. pro- <br />vision for two inter-connected sections at Radium Reservoir and <br />control of water elevations for waterfowl in the east section. a <br />200-acre irrigated waterfowl preserve adjacent to Radium Reservoir. <br />and sport fisheries at each project reservoir. <br /> <br />Pro;ect Statistics (Estimated) <br /> <br />Estimated project cost (Jan. 1975) <br /> <br />$130,000.000 <br /> <br />Water allocation <br /> <br />Irrigation (39.000 acres) <br />Municipal and industrial <br />Fish and wildlife <br /> <br />77.800 a.f. <br />44.000 a.f. <br />500 a.f. <br /> <br />Total 122.300 a.f. <br /> <br />Annual depletion of the Colorado River 85.000 a.f. <br /> <br />Annual salinity contributed to Colorado River 4 to 6 ppm <br /> <br />Benefit-cost ratio 1.03 to 1 <br /> <br />Annual benefits $5.250.000 <br /> <br />Envtronmental Impact <br /> <br />No major environmental problems have been identified as yet in <br />the San Miguel project. Construction of Saltado Reservoir in the <br />San Miguel River Canyon would convert a few miles of stream fishing <br />to reservoir fishing and sufficient releases downstream would be <br />made to maintain fishery below the dam. Diversion of water from <br />the reservoir to the project lands would be largely by tunnel. <br />thereby reducing the impact of construction on aesthetics of the <br />surrounding scenic area. Conversion of rangelan& to irrig~tionr <br />as was included in feasibility plans. would have some impact on the <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.