Laserfiche WebLink
<br />r, . c. ,~ <br />4" -6~ f: R ,\ T I () N Ai': n ~I A I N TEN ,\ NeE <br /> <br />21 <br /> <br />l <br /> <br />leaks in concrete siphons, remove sand from sand traps. repair <br />and maintain automotive and maintenance equipment. and insure <br />the delivery of clean wholesome water to the terminal reservoir at <br />Lake l\fathews. The regular cl'ew \vas assisted as necessary at the <br />westerly end of the aqueduct by distribution system forces. <br />Protection of the qual it;, of water was of prime concern to all <br />main aqueduct forces, Reservoirs were periodically inspected, <br />sampled, and spot treated with copper sulphate when necessary. <br />Water standing in canals and pumping plant forebays during <br />periods when there was no flow through the aqueduct was sim. <br />i1arly inspected, sampled, and treat.ed as required. A considerable <br />amount of sand and debris was blown into the canal during the <br />year, This material was effectively retained in the sand traps <br />which were cleaned out periodically by washing the sides with a <br />pressure pump and hose and scraping the bottoms. A truck crane <br />was used to remove the sand and debris from the traps. Box <br />siphons were flushed clean by alternating the flow between the <br />three barrels, These operations insured desirable water c011(li- <br />tions in the aqueduct syst.em throughout the year. <br />Patrol roads were graded and repaired as required to maintain <br />them in good serviceable condition, Minor damage to roads result. <br />ing from summer rain storms was repaired during August and <br />September, Drainage conditions across the aqueduct line were <br />improved at Freda siphon, West Fan Hill siphon, East Thermal <br />siphon, and along the section of conduit between Cottonwood and <br />Mecca Pass tunnels, <br />Rain storms caused no se,';ous damage to facilities, the ,rainfall <br />~ _being _weJI_distrib.utecl _bgtl\''Ce.!1 }yl;' a.!1<!. April. The rainfall re- <br />corded at Iron Mountain, headquarters of the ~";-ed";-ct mairrtenance- . <br />crew, amounted to 1.88 inches compared to 1.96 inches in the pre- <br />ceding year, At Gene the annual rainfall was 3.53 inches, at Eagle <br />Mountain 1.48 inches, and at Hayfield 3.47 inches. <br />The 12'4" diameter cilTular monolit.hic reinforced concrete Freda <br />siphon again developed lcaks at shrinkage cracks when cool water <br />was passed through during the winter months. Inspection of the <br />interior of the siphon disclosed that new cracks had developed and <br />some of the 'previously repaired cracks had reopened, All visible <br />cracks were repaired during March and the early part of April. <br />Hair line cracks were buffed wit.h a wire brush and painted with a <br />special liquid and plastic resurfaceI', All other cracks were <br />chipped to a depth of about two inches, calked with lead wool and <br /> <br />I, <br /> <br />I <br />