Laserfiche WebLink
<br />SAN JUAN-CHAMA <br />WATER ACCOUNTING <br />ALBUQUERQUE PROJECTS OFFICE <br />MAY 1993 <br /> <br />The natural inflow into Heron Reservoir during the month of May was computed to <br />be 1180 acre-feet (af) as shown on Table 3. Net San Juan-Chama losses were <br />450 af as shown on Table 2. There were 46160 af of San Juan-Chama water diverted <br />through Azotea Tunnel during May. <br /> <br />There was no water released from Heron during the month of May. <br /> <br />A summary sheet is provided for~water delivered from Heron, El Vado, and Abiquiu <br />Reservoirs. <br /> <br />Total precipitation reported at <br />inches which is 194% of normal. <br />summarized in Tables 1-3. <br /> <br />Heron Reservoir for the month of~May was 3.07 <br />The monthly computations for Heron Reservoir are <br /> <br />Total inflow into Nambe Falls Reservoir was computed to be 2906 af. Evaporation <br />loss on the reservoir was 4 af. Table 4 summarizes San Juan-Chama water at <br />Otowi. <br /> <br />Estimated sediment deposition in the San.Juan-Chama pools at Cochiti, Abiquiu, <br />and Jemez Canyon Reservoirs are presented in Tables 5A-5C. <br /> <br />Storage and evaporation of Rio Grande water in El Vado and Abiquiu reservoirs are <br />shown on Table 6. <br /> <br />All data are provisional and subject to revision as final data are collected and <br />analyzed. <br />