<br />.1,
<br />
<br />., .
<br />
<br />-"
<br />
<br />i
<br />. ,
<br />
<br />,-
<br />
<br />'-
<br />-' .
<br />
<br />.
<br />
<br />'.
<br />
<br />l
<br />Table 1 (continued)
<br />
<br />Navajo
<br />Unit
<br />
<br />Glen
<br />Canyon
<br />
<br />" Flaming
<br />CorRe
<br />
<br />Cureca nti
<br />. (Blue Mesa)
<br />
<br />Total
<br />
<br />8. Project water supply
<br />
<br />Potential diversions a/f
<br />depletions
<br />
<br />500,000
<br />250,000
<br />
<br />1,036,000,
<br />: 925,000
<br />
<br />308,000
<br />275,000
<br />
<br />56,000,'
<br />50,000'
<br />
<br />1,900,000
<br />1,500,000
<br />
<br />9. Costs allocated to
<br />
<br />Irrir,ation & other con-
<br />su-.,pt5.ve uSe s
<br />Construction
<br />Interest during con-
<br />struction @ 2~%
<br />
<br />Subtotal-Total
<br />-Per a/f
<br />
<br />29,000,000 57,000,000 17,000,000 3,000,000 106,000,000
<br />2,300,00Q" . 9,000,000' l,SOO,OOO 350,000 12,000,000
<br />31,300,000 66,000,000 18,500,000 3,350,000 118,000,000
<br />65 65 65 65 65
<br />40,000 15,000 10,000 5,000 70-,000
<br />
<br />ON&R .
<br />
<br />10. Approximate. anma1 costs based on repayment over a 40-year period at 2.875% (.0424).
<br />
<br />Repayment with interest-Total
<br />-Per alf
<br />
<br />Assuming immediate use and repayment ,over a 40-year period $5,003,0
<br />2.75
<br />
<br />11. Established water' charges per a/f
<br />of diversion in contracts executed
<br />pri or to 12/31/75, thereafter a
<br />higher rate as then determined
<br />
<br />7.00
<br />
<br />7.00
<br />
<br />7.00
<br />
<br />7.00
<br />
<br />7.00
<br />
<br />.'
<br />
<br />-.
<br />
|