Laserfiche WebLink
<br />. <br /> <br />. '~ <br />I' <br /> <br />,'. <br /> <br />'" <br /> <br />\ <br /> <br />. .- <br /> <br />4"740 <br />6/22/70 <br /> <br />, Table 1 <br />Estimated Cost of Hater Uced for NO.1 Purposes <br />StoraGe Units, Colorado River Storage Project <br /> <br />1. ERtimated project costs as of June 30, 1970 - thousands. <br /> <br />~. Con~truction costs <br /> <br />Storaee unit <br />or facilitv <br /> <br />Estimated basin <br />fund costR <br />Tota) Thru 6/3/10 <br /> <br />Glen Canyon <br /> <br />250.000 244,375 <br />~,250 6.5 , 204 <br />38,505 38,323 <br />109,854 82,390 <br />152 .57[. 123,973 <br />616,182 554,265 <br />6,500 <br /> <br />Flaming Gorge <br /> <br />Navajo <br /> <br />Curecanti <br /> <br />Transmis'sion <br />Division <br /> <br />Totals <br /> <br />Estimated OH&R <br /> <br />b. Interect durin~ construction @ 2%% <br /> <br />Glen Canyon 27,304 <br />Flaming Gorge 4,832 <br />Navajo 2,652 <br />Cureccnti 9,593 <br />Transmission <br />Division 6.261 <br />Total 50,642 <br /> <br />Estimated Section 8 <br />F~~t'~L Recrc4"~t i on <br /> <br />508 <br /> <br />1,833 <br />. , <br /> <br />665 <br /> <br />3,579 <br /> <br />6.585 <br /> <br />" <br /> <br />28.338 <br />4.354 <br /> <br />2,522 <br /> <br />8,469 <br /> <br />43.683 <br /> <br />-- <br /> <br />-- <br /> <br />Costs-V <br />Totnl <br /> <br />28.846 <br /> <br />6,187 <br /> <br />3,187 <br />12,048 <br /> <br />50.268 <br /> <br />, <br /> <br />1/ DOlOS not include coets of {'aciHtics constructed by the l-'orest Service. <br />