My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05569
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:55 PM
Creation date
10/12/2006 1:07:25 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.127.J
Description
Savery-Pot Hook Project
Basin
Yampa/White
Water Division
6
Date
8/28/1962
Author
Paul Rechard
Title
Savery-Pot Hook Project Water Supply Analysis
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />M 1955 the reservoir came within 4,500 acre-feet of filling (6,000 acre-feet <br />C\! <br />r- was released for fish during October-fune) and was short 2,800 acre-feet <br /> <br />in September. In 1959 the reservoir only accumuiated a content of 8,700 <br /> <br />acre-feet and yet released 8, 100 acre-feet for fish during the period October <br /> <br />through June. In this year Pot Hook reservoir was called upon to meet Little <br /> <br />Snake River demands in August. In September the shortage was 2,000 acre- <br /> <br />feet. <br /> <br />Irrigation shortages by areas are summarized in Table 20 a-m and <br /> <br />for the project as a whole by years in Table 21. The benefits of the project <br /> <br />should be readily recognized by a review of these tables. Also, it should <br /> <br />be recoqnized that the planning for the Definite Plan Report could well <br /> <br />provide additional benefits over those shown. <br /> <br />- 8 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.