Laserfiche WebLink
<br />; lJ") <br />-.oj <br />t"'- <br /> <br />, <br />\ <br /> <br />,- i <br />, , <br />\ <br />, <br />, <br /> <br />lY" <br />,':[if) <br />'<',) , <br /> <br />';-,~,~','. <br />~:~1 <br /> <br />UPPER COLORADO RIVER CONiMISSION <br />355 South Fourth East Street <br />Salt Lake City 11, Utah <br /> <br />I!JJ rr ' <br />lilt; <br />..~ <br /> <br />August 28, 1962 <br /> <br />'..,: ), <br />'( !~- .~..~ <br />,"/ G' f~ _ i.~q..-!l <br />~ CO, () ," If)(;;} - <br />" '84/14h:4rt~ <br />w 804"1 <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Members of the Engineering Committee <br /> <br />FROM: <br /> <br />Paul A. Rechard, Principal Hydraulic Engineer <br /> <br />SUBJECT: <br /> <br />Savery-Pot Hook project Water Supply Analysis <br /> <br />Attached is a copy of a report on the above subject. The <br />study and report were prepared in order to become better acquainted with the <br />proposed proj ect and its operation. <br /> <br />In general, this study confirms the opinion that there is suf- <br />ficient water supply in the Little Snake River Area for the proposed project. <br />It is believed that the States may find the report of benefit during their <br />review and discussions with the Bureau of Reclamation. <br /> <br />In compliance with the procedure expressed at the Commission <br />meeting in Vernal, Utah on August 8, this report is being sent to you for <br />review. The report might be considered for approval by the Commission at <br />its next meeting. <br />