My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05566
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:54 PM
Creation date
10/12/2006 1:07:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.124.A
Description
Pine River
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
8/1/1958
Author
USDOI Bureau of Recl
Title
Pine River Project Extension Colorado and New Mexico: Special Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUBSTANTIATING MATERIALS <br /> <br />t;Une between fields and aJ.so the time required for each farm operation. <br />The class 2 and 3 lands are separated by lands of lower class which <br />would of necessity be included in farm units. Thus the investment in <br />land, the taxes on land, and fencing costs would be higher than if the <br />farm were compact. Estimated annual payments of about 85 cents an acre <br />on reimbursable costs of the Vallecito Reservoir would add to farm costs <br />under with-project conditions. <br /> <br />Irrigation Repayment <br /> <br />Budgets prepared for representative farms for both without and with <br />project conditions were compared to derive the estimated ability of proj~ <br />ect farmers to pay project costs. In each budget net farm income was <br />determined by deducting anticipated expenses from gross income for an <br />average year. Payment capacitYI or the amount available for water charges, <br />;l.s the residuaJ. after deducting a family living allowance for the farm <br />family. A famUy living allowance of $2,800, which was used in the with- <br />projeot bUdget, is about the minimum that would meet the Bureau of Recla- <br />mation objective of providing tlle same level of living for farm families <br />as is enjoyed by persons in other occupations. All costs in the farm bud- <br />gets are based on a price index level of 250 for prices received and 265 <br />for prioes paid (1910-14=100). SUIllIIlary data. from the two budgets and the <br />differenoe between the two ptojacted for the entire project area of 3,100 <br />acres are tabulated on the following page. <br /> <br />The with-project budget shows an annuaJ. payment capacity for proj- <br />ect water of $1.70 an acre. This would be only slightly more than haJ.f <br />enough to pay project costs for operation, maintenance, and replacement <br />and would permit no repayment of costs of constructing the project works. <br /> <br />Financial analysis <br /> <br />Benefit-Cost AnalySis <br /> <br />The economic justifica.tion,of developing the Pine River project <br />extension was determined through a comparison of project benefits from <br />a National standpoint with the Federal oosts of development. Comparisons <br />were made for a 100-year period. Both benefits and costs were computed <br />at average annual equivalent values at 2.5 percent interest. <br /> <br />Benefits.--Irrigation benefits f~om the extension development are <br />expected to average about $73,100 annually over the 100-year period of <br />analysis which includes the lO-year development periOd. About $27,900 <br />of the total represents direct benefits measured by the increase in nettaw,m <br />income that would be reaJ.ized from the extension. Approximately $35,300 <br />represents indirect benefits measured by the increased profits of busi- <br />nesses handJ.ing, processing, and marketing products from the extension <br />area and of enterprises supplying goods and services to the farms within <br />the area. The remaining $9,900 would be public benefits realized from <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.