My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05557
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:52 PM
Creation date
10/12/2006 1:07:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1985
Author
CRBSCF
Title
Seventh Annual Progress Report - Water Quality Standards for Salinity - Colorado River System - December 1985
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br /> <br />: <br /> <br />N <br />CJ1 <br />~ <br />W <br /> <br />economically feasible to implement a comprehensive municipal <br /> <br />salinity control program for these very small salt loads. <br />Water Quality Management Planning - The Water Quality <br />Management Planning Program in Wyoming is under the direction <br />of the Water Quality Division of the Department of <br /> <br />Environmental Quality. <br /> <br />The Clean Water Report for <br /> <br />Southwestern Wyoming addresses water quality in Lincoln, <br />Uinta, and Sweetwater Counties. This report was adopted at <br />the local level, certified by the Governor, and conditionally <br /> <br />approved by the EPA on October 9, 1980. The Governor's <br /> <br />certification recognizes a salinity control program for the <br /> <br />Green River Basin as a major water quality priority. The <br />report recommends continuation of the Big Sandy River Unit <br /> <br />Study, improvement of irrigation efficiencies, and further <br /> <br />study of a number of other management alternatives. Salinity <br />control features for the Big Sandy River are being evaluated <br />in conjunction with the ongoing cooperative Reclamation and <br />SCS salinity control planning for the Big Sandy River Unit. <br /> <br />Planning and investigation efforts of Reclamation are <br /> <br />centered around the lining of canals within the Eden <br />Irrigation District of the Big Sandy River Basin. The SCS is <br />developing an onfarm implementation plan to be utilized in <br /> <br />conjunction with the canal lining efforts of Reclamation. <br /> <br />The state strongly encourages and supports the current thrust <br />of Reclamation and SCS efforts in the Big Sandy River Unit. <br /> <br />The Statewide Water Quality Management Plan establishes <br /> <br />an institutional framework under which planning and <br /> <br />-37- <br /> <br />,i, <br />
The URL can be used to link to this page
Your browser does not support the video tag.