My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05557
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:52 PM
Creation date
10/12/2006 1:07:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1985
Author
CRBSCF
Title
Seventh Annual Progress Report - Water Quality Standards for Salinity - Colorado River System - December 1985
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />N Another cost-effective strategy under investigation to <br />~ <br />00 further reduce salinity loading is to use ground water <br />Ci> <br />barriers in selected areas of the wash to develop a ground <br /> <br />water detention basin system. A verification of the strategy <br /> <br />is being proposed for the Whitney area. <br /> <br />Water Quality Improvement Program Units <br />(Reclamation-Department of Agriculture) <br /> <br />With the passage of P.L. 98-569, signed on October 30, <br /> <br />1984, Reclamation's planning activities under P.L. 93-320 for <br /> <br />the McElmo Creek Unit were concluded. Advance planning and <br /> <br /> <br />construction of the salinity control features will now be <br /> <br /> <br />incorporated under the Dolores Project. The SCS report on <br /> <br /> <br />McElmo Creek Unit, published in 1983, shows the activities of <br /> <br /> <br />both Reclamation and SCS have been coordinated and are <br /> <br />compatible. <br /> <br />The Uncompahgre project portion (Stage I) of the <br /> <br />Lower Gunnison Basin Reclamation plan was authorized for <br /> <br />construction by P.L. 98-569. <br /> <br />Advance planning studies <br /> <br />continued, and SCS plans to revise its implementation plan to <br /> <br /> <br />include priority areas and implementation phases. <br /> <br /> <br />In the Uinta Basin, coordination between Reclamation and <br /> <br />the SCS has been maintained. USDA continues to focus upon <br /> <br />onfarm improvements but has strengthened coordination in <br /> <br />planning canal and lateral group projects as part of the <br /> <br />. . <br /> <br />Central Utah project and Reclamation's salinity project. The <br /> <br /> <br />preferred Reclamation plan, completed in FY 1985, consists of <br /> <br />lining 55 miles of canals and laterals. The Regional <br /> <br />-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.