Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />classes to the public in water treatment by reverse osmosis. The first class started in August 1999 <br />in cooperation with Arizona Western College in Yuma and graduated in the spring of2001. <br /> <br />I <br /> <br />Colorado Ri\-'er Channel Aggradation Below Gila River Confluence <br /> <br />I <br /> <br />The 1993 Gila River flood deposited approximately 10 million cubic yards of sediment in the <br />Colorado River between its confluence with the Gila and Moreles Dam. An additional <br />unspecified volume of sediment was deposited in the river chaTU1e1 below Morelos Dam, The <br />aggradation of the channel has substantially reduced the river's capability to carry flood flows, <br />to act as a drain for groundwater, and has occasionally caused operational problems with the <br />delivery of Treaty water to Mexico at Morelas Dam. <br /> <br />I <br />I <br /> <br />The Yuma Area Office developed a project proposal to address the aggradation problems in <br />cooperation with local irrigation districts, the IBWC, Native American Tribes. local <br />environmental organizations. local governments, and other state and federal agencies. <br /> <br />I <br /> <br />I <br /> <br />The overall project has been developed in phases. Phase I of the project was completed in late <br />1997 so the channel below Morelos Dam could accommodate flood control releases from Hoover <br />Dam during the winters of1997 and 1998. Phase 1 consisted oflimited clearing ofa flow path <br />in the channel below Morelos Dam. and realignment of the channel upstream of Yuma at River <br />Mile 31, where the levee was in danger of being breached during high flows. <br /> <br />I <br /> <br />I <br /> <br />Phase 2 of the project began in September 1999, Phase 2 consisted of dredging a sediment basin <br />in the river channel immediately upstream of r>.10relos Dam to a location about one mile above <br />the NIB, The sediment basin will alleviate most of the operational problems due to sediment <br />laden waters being delivered to l\1exico at Morelos Dam. Phase 2 was completed in April of <br />2001. <br /> <br />I <br />I <br /> <br />The need for completing Phases 3 and 4 of the project is currently being reviewed and studied. <br />The space building and flood control releases experienced during the winters of 1997, 1998, and <br />1999, as well as the natural dynamic nature of the river system, make this review prudent. <br /> <br />I <br /> <br />Limitrophe Division Below Mor-elos Dam <br /> <br />I <br /> <br />The IBWC has initiated the development of an Environmental Impact Statement (EIS) to <br />address the work necessary to develop and undertake a boundary preservation project within <br />the Limitrophe section of the Colorado River. The flood events of 1983 and 1993 have <br />changed the course of the river and deposited approximately 10 million cubic yards of material <br />within the first 5.5 miles of the river below Morelos Dam, affecting the carrying capacity of <br />the river and contributing to higher groundwater levels in the Yuma Valley. The EIS will <br />identify the best U.S.lMexico alternative to be undertaken for the proposed project. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />October 15, 2001 <br /> <br />17 <br /> <br />I <br />