Laserfiche WebLink
<br />. <br /> <br />iGS'~' <br /> <br />Plan of Development <br /> <br />Municipal and Industrial Water Supply <br /> <br />During the investigations of the unit, several communities down- <br />stream from the Narrows Dam site evidenced interest in a reservation <br />of water for future municipal and industrial needs. No firm commit- <br />ment was made. It appears that the communities have, or can readily <br />obtain, an ample supply from ground water for all foreseeable needs; <br />therefore, this possibility has not been incorporated as a function <br />of the plan of development. In the unlikely event of urgent need <br />for municipal and industrial water in addition to, or as a replace- <br />ment for, ground water the communities probably would have to acquire <br />irrigation water rights. <br /> <br />DEFERRED POTENTIALITIES <br /> <br />. <br /> <br />Following elimination of the Weld County Dam site in favor <br />of the Narrows site in September 1964, the Colorado Water Conserva- <br />tion Board requested that studies of the Narrows Unit be expedited. <br />The Board further requested that the Narrows Unit studies be expanded <br />to include: (A) a pump unit on the South Platte River near Sterling, <br />Colo., for the purpose of increasing the project water supply, and <br />(B) a pump unit or units near or adjacent to the Narrows Reservoir, <br />for the purpose of supplying additional irrigation water to either <br />the Riverside or Bijou Irrigation Distr1cts, or both, if such pump- <br />ing can De economically justified. Later, the Board also requested <br />studies on a well field or pump lift to provide supplemental water <br />to ditch systems in the JulesDurg area. <br /> <br />Because the floods of June 1965 renewed interest in the control <br />of floods from Bijou Creek, a potential channel for diverting Bijou <br />Creek into the Narrows Reservoir was also studied. <br /> <br />These additional potentialities Were studied to reconnaissance <br />standards. None of them are recommended for inclusion as components <br />of the Narrows Unit at this time. They are considered as separaDle <br />segments that should be justified incrementally. A brief description <br />of each potentiality follows. <br /> <br />. <br /> <br />32 <br /> <br />* <br />