My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05537
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05537
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:47 PM
Creation date
10/12/2006 1:06:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.100
Description
Narrows Unit - Project Description
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1967
Title
Report on the Narrows Unit Colorado South Platte Division Missouri River Basin Project part 1
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />lS~~ <br /> <br />. <br /> <br />Plan of Development <br /> <br />Denver to the State line, appeared before the Colorado Water <br />Conservation Board at a regular meeting in Denver and requested the <br />Board to reinitiate studies leading toward the construction of channel <br />storage on the South Platte River. The Board agreed to this request <br />and in the years 1959-l963 it furnished $82,950 to the Bureau of <br />Reclamation for further studies of the Narrows Unit. <br /> <br />Because of local interest in an upstream site, the Bureau of <br />Reclamation was re~uested to make a hydrologic and cost comparison <br />of the Narrows and Weld County (Hardin) Reservoir sites. The upstream <br />Weld County site is about 23 airline miles from the Narrows site. <br /> <br />In February 1963, the Bureau documented the results of its <br />hydrologic studies in a publication entitled "Site Selection Presenta- <br />tion to the South Platte Steering Committee." The essence of the con- <br />clusions set forth in the presentation were to the effect that neither <br />site had a clear-cut hydrologic advantage over the other site, under <br />either historic or expected 1990 flow conditions. Storage at the <br />Narrows site provides a more adequate supply for the lower basin while <br />storage at the Weld County site provides a more adequate supply for <br />the midsection of the basin. <br /> <br />. <br /> <br />The hydrologic conclusions drawn by the Bureau were studied <br />extensively by the staff of the Colorado Water Conservation Board <br />which indicated no major disagreement on the hydrologic studies. The <br />studies disclosed that a reservoir at the Weld County site would <br />reduce annual valley water shortages about 2,500 acre-feet more than <br />the Narrows site under the present time level and would reduce shortages <br />9,000 acre-feet more annually under the 1990 time level. Offsetting <br />the economic advantages of this additional water supply at Weld County <br />was the fact that the flood control benefits would be greater at the <br />Narrows site. <br /> <br />It appeared that the combined purely economic values of water <br />conservation and flood control at either site, for all practical <br />purposes, were identical. A selection of one site in preference to <br />the other, based upon combined hydrologic and flood control considera- <br />tions, was therefore eliminated. <br /> <br />The remaining major item in the site selection was the matter of' <br />comparative costs. In a report entitled "Site Selection Report, <br />Narrows Unit - Colorado" dated September 1961, the Bureau estimated <br />the total cost of the Narrows site at $38,334,000 and the cost of the <br />Weld County site at $45,459,000. At the time of that estimate <br />detailed geologic investigations were available on the Narrows site, <br /> <br />. <br /> <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.