Laserfiche WebLink
<br />SUMMARY SHE1!."TS (Continued) <br /> <br />PROJ.EX:;T FEl'o.TlIHES <br /> <br />Soap Park Dam <br />He ight (feet) <br />Crest length (feet) <br />Soap Park Reservoir capacity (acre-feet) <br />Active <br />Inactive and dead <br />Total <br /> <br />Crystal <br />Creek <br /> <br />Diversion dams <br />Overflow crest length (feet) <br />Diversion capacity (second-feet) <br /> <br />60 <br />600 <br /> <br />Distribution system <br />Black Mesa Conduit <br />Frui tland Canal <br />Gould Canal structure <br />Laterals <br />Crystal Creek channel protection <br /> <br />Length <br />(miles) <br /> <br />11.2 <br />21.0 <br />1.8 <br />42.0 <br />3.0 <br /> <br />'\ <br /> <br />4 <br /> <br />246 <br />1,150 <br /> <br />47,000 <br />1., 23 5 <br />48,235 <br /> <br />Curecanti <br />Creek <br /> <br />50 <br />250 <br /> <br />Diversion <br />capacity <br />(second- feet) <br /> <br />275 <br />600 <br />120 <br />3 to 40 <br /> <br />.. <br />