My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05532
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:46 PM
Creation date
10/12/2006 1:05:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.600.20
Description
Fryingpan-Arkansas Project - Studies - Environmental Studies
State
CO
Basin
Arkansas
Water Division
2
Date
4/16/1975
Author
US DoI BoR
Title
Final Environmental Impact Statement Volume 1 of 2
Water Supply Pro - Doc Type
EIS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />40G'-k <br /> <br />TABLE OF CONTENTS (Contents) <br /> <br />10. Granite Siphon Alternatives . . . . . . . <br />a. Impacts Associated with a Tunnel from <br />Granite Creek to the South Fork <br />Tunnel. . . . . . . . . . . . . . . <br />b. Impacts Associated with a Buried Conduit <br />along the South Side of the Fryingpan <br />River . . . . . . . . . . . . . . . . . <br />c. Impacts Associated with the Three Methods <br />of Constructing Granite Siphon. . . . . <br />F. Deleted and Deferred Features . . . . . . <br />1. Deferred Last Chance and Lime Creek Diversions <br />a. Associated Impacts. . . <br />2. Deleted Malta Diversion Dam and Canal <br />a. Associated Impacts. <br /> <br />CHAPTER X <br /> <br />CONSULTATION AND COORDINATION . . . <br /> <br />. . . . . . . . . . <br /> <br />A. Consultation and Coordination During Development <br />of the Proposal . . . . . . . . . . . . . <br />1. Pre-NEPA Consultation and Coordination. . <br />2. Post-NEPA Consultation and Coordination . <br />B. Consultation and Coordination Concerning the <br />Fryingpan-Arkansas Draft Environmental Statement <br />C. Coordination During Review of the Draft <br />Environmental Statement . . . . . . . . . . . <br />1. Review of the Draft Environmental Statement <br />2. Public Hearings . . . <br />3. Unresolved Conflicts. <br />Draft News Release. <br /> <br />BIBLIOGRAPHY . <br /> <br />GLOS SARY . <br /> <br />xix <br /> <br />. <br /> <br />Pa~e <br /> <br />IX- 36 <br /> <br />36 <br /> <br />36 <br /> <br />38 <br />39 <br />39 <br />39 <br />40 <br />40 <br /> <br />x- l <br /> . <br /> 1 <br /> 1 <br /> 3 <br /> 4 <br /> 5 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.