Laserfiche WebLink
<br />, <br />40G'-k <br /> <br />TABLE OF CONTENTS (Contents) <br /> <br />10. Granite Siphon Alternatives . . . . . . . <br />a. Impacts Associated with a Tunnel from <br />Granite Creek to the South Fork <br />Tunnel. . . . . . . . . . . . . . . <br />b. Impacts Associated with a Buried Conduit <br />along the South Side of the Fryingpan <br />River . . . . . . . . . . . . . . . . . <br />c. Impacts Associated with the Three Methods <br />of Constructing Granite Siphon. . . . . <br />F. Deleted and Deferred Features . . . . . . <br />1. Deferred Last Chance and Lime Creek Diversions <br />a. Associated Impacts. . . <br />2. Deleted Malta Diversion Dam and Canal <br />a. Associated Impacts. <br /> <br />CHAPTER X <br /> <br />CONSULTATION AND COORDINATION . . . <br /> <br />. . . . . . . . . . <br /> <br />A. Consultation and Coordination During Development <br />of the Proposal . . . . . . . . . . . . . <br />1. Pre-NEPA Consultation and Coordination. . <br />2. Post-NEPA Consultation and Coordination . <br />B. Consultation and Coordination Concerning the <br />Fryingpan-Arkansas Draft Environmental Statement <br />C. Coordination During Review of the Draft <br />Environmental Statement . . . . . . . . . . . <br />1. Review of the Draft Environmental Statement <br />2. Public Hearings . . . <br />3. Unresolved Conflicts. <br />Draft News Release. <br /> <br />BIBLIOGRAPHY . <br /> <br />GLOS SARY . <br /> <br />xix <br /> <br />. <br /> <br />Pa~e <br /> <br />IX- 36 <br /> <br />36 <br /> <br />36 <br /> <br />38 <br />39 <br />39 <br />39 <br />40 <br />40 <br /> <br />x- l <br /> . <br /> 1 <br /> 1 <br /> 3 <br /> 4 <br /> 5 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> <br />. <br />