My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05522
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:43 PM
Creation date
10/12/2006 1:05:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.105.L
Description
Navajo Reservoir
State
NM
Basin
San Juan/Dolores
Date
10/1/1963
Author
USDOI-BOR
Title
Interim Operating Rules - Navajo Reservoir - Navajo Unit - Colorado River Storage Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UNITED STATES <br />DEPARTMENT OF THE INTERIOR <br /> <br />BUREAU OF RECI..AMA TION <br /> <br />(b{OYll{lO VfvH .::J'rn ,;,'. <br />~J(l.V() 1(1 he ::"1 ',0; r-- <br />J . <br />('1\. "~IJ I ':'i";' <br /> <br />tl: <br /> <br /> <br />~~'#~~ <br /> <br />IN REPL Y <br />REFER TO: <br /> <br />4-900 <br /> <br />REGIONAL OFFICE. REGION 4 <br />p, O. BOX 360 <br />SALT LAKE CITY 10. UTAH <br /> <br />OCT <br /> <br />4 1963 <br /> <br />If"., j;': ", <br />\i; <br /> <br />. -, , ',;~ '{' -~~:" <br /> <br />Mr. IvaI V. Soslin <br />Lxecuti ve Director <br />Upper Colorado River CommissiO!'\ <br />3~6 South 5th East <br />Salt Lab City 2, utah <br /> <br />',-' .' <br /> <br />l~, <br /> <br />j~'-":~}~:;>.'-C"- . ;:-i Qr.Afd) <br />v\t~,.;)l.on;.<\.. ,,:~ ,"'if <br /> <br />[P. ar Mr. Goslin: <br /> <br />en AUf'ust 15, 1%2, lo'e transmitted to you copies of our "Initial Oper- <br />ating Rule"l" which \oI~C@ to govern the op.aration of Navajo Reservoir for <br />the next few years. <br /> <br />No" that clol!!ure h'1" heen accomplished at Glen Canyon Dam and the 1963 <br />ru.,off season is over, we have revised the rules. Enclosed are t.n <br />copies of the revised "Interim Operating Rules" for your information. <br />The minimum release oridnally established to cover tJ.e construction <br />period has ~en increased to 500 c.f.s. This will tend to increase <br />storal"c in Lake Powell and maintain a lower reservoir at Navajo ur.til <br />the reservoir is needed for the Navajo Indian Irrigation Proj ect. <br /> <br />Low.;r reservoir levels will be particularly critical during the con- <br />struction period of the inlet portal of the Navajo Main Callal inside <br />the reservoir, now scheduled for 1954 and 191;5. <br /> <br />Sincerely yours. <br />~ '--, A;J_~~ <br />.,~ P'It tA~..,,~ ~ <br /> <br />'~ <br /> <br />Regional Director <br /> <br />~ <br /> <br />Enclosur.e (10) <br /> <br />.~ <br /> <br />cc: <br />(See attached sheet) <br />
The URL can be used to link to this page
Your browser does not support the video tag.