My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05502
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:38 PM
Creation date
10/12/2006 1:05:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543
Description
Closed Basin Division
State
CO
Basin
Rio Grande
Water Division
3
Date
10/24/1983
Title
Agenda Item 12 - November 3-4 1983 - Board Meeting -- Approval of Stage 3 Closed Basin Project
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r-- <br />;! <br /> <br />",..J!) <br />-" <br /> <br />i~J~) <br /> <br />~ i'). <br />11)'"''' <br />,-;.) <br />(;1;; <br /> <br /> <br />COLORADO WAfER CGNSfltVAnON SOARD <br />o.partmelll 01 Not...,ol R..."urces <br />3%3 Stat. Centennial a~ilding <br />1313 Slwlmn Street ' <br />Den>.., Colondo 80203 <br />P!'l"".: 13031 846-J<Wl <br /> <br />Sli\TEOF COLORADO <br />(,~.,,"',':~: ' <br />- <br /> <br /> <br />RicNtd o. l..1mm <br />Governor <br /> <br />,M E M 0 RAN DUM <br /> <br />J. WUli.trr McOQltoiald <br />Oil'ft:tot <br />David W. Walker <br />DepUfY Oir<<Ctor <br /> <br />TO: Members, CWCB <br /> <br />FROM: Bill McDonald <br /> <br />DATE: October 24, 1983 <br /> <br />SUBJECT: Agenda Item 12, November 3-4, 1983, Board Meeting-- <br />Approval of Stage 3, Closed Basin project <br /> <br />Introduction <br /> <br />The Act authorizing the Closed Basin Project provides, in <br />Section lOl(b),that construction of each successive stagea'fter <br />Stage 1 of the project may be undertaken only if consented to by <br />the Colorado Water Conservation Board and the Rio Grande Water <br />Conservation District. The Bureau of Reclamation plans to <br />commence the preparation of designs and specifications for the <br />conveyance channel and laterals in stage 3 in federal fiscal year <br />1984 and is therefore seeking the Board's and District's consent <br />to proceed. <br /> <br />Discussion <br /> <br />My August 3l, 1983, memorandum to the Board enclosed a <br />control schedule for the Closed Basin project. As indicated <br />thereon, the BUreau of Reclamation's current schedule calls for <br />construction on the conveyance Channel and laterals in Stage 3 to <br />be initiated in May, 1985. The Bureau has advised that it <br />expects, per this schedule, to be able to pump Stage 1-2 tor at <br />least one year before commencing prOduction pumping in Stage 3. <br /> <br />~mmendation <br /> <br />I recommend that the Board adopt the enclosed resolution, <br />whiCh resolution would give the Board's consent only to prepare <br />design and specifications for, and to construct, the conveyance <br />channel and laterals, in Stage 3. Consent to commence production <br /> <br />(over) <br /> <br />707 <br />con! chan <br /> <br />lonn R. Fefcher. Ct'lalrrrtan. HerO(ltft H. V.mttemoer,Vrce Chai,m<tn <br />C.M. Furne.1lulI. Ffoyd f... ClHl. O.Jef. G(;nt..~OOoll'rt A.1Kltson.liici'loltd w. !.:Ji't,lStOn, Jr., frl!Oenck V. K~Ol!!ger. Oavid W. Robbins <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.