Laserfiche WebLink
<br />TRANSPORTATION <br /> <br />50-MISSOURI RIVER NAVIGATION, BANK STABILIZATION CONTROL PROG. <br />Army Corps of Engineers <br />Transportation, Recreation <br />Also in Middle Missouri <br /> <br />Ongoing program implementation thru FY 831 main <br />stem Missouri River from Sioux City to mouth, <br />NE, lA, KS, MOl improve navigation channels, bank <br />erosion & stab., rec. facil.1 cost $438 million. <br /> <br />c: <br /> <br />~ <br /> <br />i"~ <br /> <br />..., <br /> <br />WATER OUALITY <br /> <br />(;.J <br /> <br />LBGAL ARD INSTITUTIONAL FACTORS <br /> <br />.............'...................................................................................................... <br /> <br />IHSTRBAH PLOWS <br /> <br />WBATBBR MODIPICATION <br /> <br />I <br />N <br />~ <br />W <br />I <br /> <br />................................................................................................................... <br /> <br />