My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05501
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:38 PM
Creation date
10/12/2006 1:04:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1980
Author
MRBC
Title
Missouri River Basin Water Resources Management Plan - Comprehensive Coordinated Joint Plan - Water and Related Land Resources - Final Environmental Impact Statement - Part II-Chapters 9-Appendices
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />18-LOWER GRAND RIVER LEVEE SYSTEM <br />Army Corps of Engineers <br />Flooding <br /> <br />New start implementation study for a levee system <br />to provide a 50 year level of flood protection <br />along the Grand River downstream of Yellow Creek; <br />FY 84 completion; construction estiaate $30.9 <br />million~ local share $390,000. <br /> <br />.................................................................................................................. <br /> <br />19-FORT sccrrr lAKE RBS'lUDY, KANSAS <br />Army Corps of Engineers <br />Flooding <br /> <br />Deferred feasibility study thru FY 82; flood <br />control, water supply and recreatIon on Marrnaton <br />River; Bourbon County; cost $1. 2 million. <br /> <br />.......................................................................................................................... <br /> <br />20-BILLSDALE LAKE, KANSAS <br />Army Corps of Engineers <br />Flood, F5:W, M5:1 Rural Supply~ Rec., Water Qual. <br /> <br />Ongoing program implementation thru FY 82; <br />multipurpose reservoir, Big Bull Creek; Miami <br />County; cost $59 million. <br /> <br />.................................................................................................................................. <br /> <br />21-BIACKBIRD-WILOCAT WATERSHED PROJECT, IOWA, MISSOURI <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation" Management <br /> <br />Watershed in Appanoose County, Iowa and Putnam 5: <br />Adair counties, Missouri, recommended for planning <br />FY 82; project envisions 4: flood detention struc. <br />5: 25 grade stabilization struct.; cost $1.4 million. <br /> <br />.............................................................................................................................. <br /> <br />I <br />tv <br />'" <br /><>> <br />I <br /> <br />22-EAST FORK OF GRAND IUVER~ WATERSHED PROJECT, IOWA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation 5: Management <br /> <br />watershed in Ringold 5: Union counties; recommended <br />for planning; project envisions 5 flood detention <br />structures; cost $4.5 million. <br /> <br />.............................................................................................................................. <br /> <br />23-LOOG CREEK WATERSHED PROJECT, IOWA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation 5: Management <br /> <br />Watershed in Dacatur 5: Clarke counties; recommended <br />for planning; project envisions 4 flood retention <br />structures; cost $3.4 million. <br /> <br />................................................................................................................................ <br /> <br />24-MEDIClNE CREEK WATERSHED PROJECT, IOWA, MISSOURI <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation" Management <br /> <br />Watershed in Wayne County, Iowa and Mercer 5: Putnam <br />counties Missouri, recommended for planning FY 84; <br />project envisions 4 flood detention struct. 5: 20 <br />grade stabilization structures; cost $1.2 million. <br /> <br />............................................................................................................................. <br /> <br />25-UPPER POTTAWAT<>>UE WATERSHED PROJECT, KANSAS <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation" Management <br /> <br />watershed in Anderson, FranklIn 5: Coffey <br />counties; recommended for planning n 961 project <br />envisions 15 flood detention structures; <br />oost $4..8 million.. <br /> <br />............................................................................................................................ <br />
The URL can be used to link to this page
Your browser does not support the video tag.