Laserfiche WebLink
<br />45-BOSTWICK DIVISION, REHABILITATION & BETTERMENT, NEBRASKA, <br />DOI/Water and Power Resources ServIce <br />Irrigation <br /> <br />Proposed new start rehab. & betterment project <br />on Republican R. in south-central Nebraska; will <br />replace open laterals with pipe; cost to be <br />determined. <br /> <br />................................................................................................................... <br /> <br />46-BOSTWICK DIVISION, CONSTRUCTION, KANSAS <br />DOI/Water and Power Resources Service <br />Irrigation, Fish & Wildlife, Flooding <br /> <br />Completion of ongoing, operating irrigation pro- <br />ject; remaining program consists of drainage works <br />on 75,000 acres; Republican R. in Kan and Neb; <br />total ~oject cost $51 million, $4 million <br />remaining. <br /> <br />o <br /> <br />~.", <br />~~ <br /> <br />................................................................................................................... <br /> <br />~,.,_.r\ <br />(;..:' <br />i...:l <br />("~...it. <br /> <br />47-FRENCHMAN-CAMBRIDGE DIVISION, CONSTRUCTIbN, NEBRASKA <br />DOl/Water and Power Resources Service <br />Irrigation <br /> <br />Completion of irrigation project in Nebraska's <br />Republican River basin; remaining program is sub- <br />surface drains; total project cost $83 million; <br />balance to complete $170,000. <br /> <br />................................................................................................................... <br /> <br />48-FRENCHMAN-CAMBRIDGE DIVISION, REHAB. & BETTERMENT, NEBRASKA <br />OOI/Water and Power Resources Service <br />Irrigation <br /> <br />Ongoing construction to replace open laterals with <br />pipe in Frenchman Unit to stabilize water supply: <br />completion scheduled FY 83; total cost $4.4 million. <br /> <br />I <br />N <br />N <br />.... <br />I <br /> <br />................................................................................................................... <br /> <br />49-GLEN ELDER UNIT, FEASIBILITY STUDY, KANSAS <br />DOI/Water and Power Resources Service <br />Irrigation, M&I Supply. F&H. Rec, Water Quality <br /> <br />Resumption of feasibility study for irrigation unit <br />using existing Waoonda Lake; study will begin FY 82: <br />completed FY 85, will study construction of <br />canals: laterals & drains; study cost $865,000. <br /> <br />50-SCANDIA UNIT, FEASIBILITY STUDY. KANSAS <br />DOI/Water and Power Resources Service <br />Irrigation, H&I Supply, F&W, Ree, Water Quality <br /> <br />Resumption of feas. study to begin in FY 83 for <br />irrigation on Republican R. and water supply for <br />Belleville, Kan: involves diversion dam, pumping <br />plants, canals, laterals; study cost $820,000. <br /> <br />................................................................................................................... <br /> <br />51-LITTLE BLUE WATER RESOURCES PROJEX:T STUDY, NEBRASKA <br />Little Blue Natural Resources District <br />Irr igation <br />Also in Platte-Niobrara Subbasin <br /> <br />Proposed feasibility study for a project to divert <br />115,000 AF of Platte R. flows to storage and <br />delivery system in the Little Blue basin, to irri- <br />gate 40-60,000 acres~ study cost $240,000: 5 yrs. <br /> <br />................................................................................................................... <br /> <br />