My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05501
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:38 PM
Creation date
10/12/2006 1:04:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1980
Author
MRBC
Title
Missouri River Basin Water Resources Management Plan - Comprehensive Coordinated Joint Plan - Water and Related Land Resources - Final Environmental Impact Statement - Part II-Chapters 9-Appendices
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />32-LOWER SALT CREEK: WATERSHED PROJECT, KANSAS <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />Project under construction; completion scheduled <br />FY 81; located in Lincoln, Mitchell and Ottawa <br />Cos.; features 5 flood retention structures; <br />cost $1.3 million. <br /> <br />................................................................................................................... <br /> <br />33-UPPER WAKARUSA WATERSHED PROJECT, KANSAS <br />USDA/Soil Conservation Service <br />Flooding, Recreation <br /> <br />Project under construction; completion scheduled <br />FY 83; located in eastern Kansas; features 21 <br />flood retention and 2 multipurpose structures; <br />cost $6.6 million. <br /> <br />- <br />,"-,,,,:I <br />~j <br />~",;-,~ <br /> <br />34-LOWER WAKARUSA WATERSHED PROJOCT, KANSAS <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />......: <br />, <br />,-- <br />'.::;~ <br /> <br />Project under construction; completion scheduled <br />FY 80; located in Douglas County; features 8 <br />flood retention structures; 1.8 miles floodway; <br />cost $2.5 million. <br /> <br />35-BIG INDIAN WATERSHED PROJECT, NEBRASKA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation and Management, Recreation <br /> <br />Operational project in Gage & Jefferson Counties; <br />scheduled completion FY 80; features 2 grade stab.; <br />31 flood retention, and 1 multipurpose structure; <br />cost $4.2 million. <br /> <br />................................................................................................................... <br /> <br />I <br />N <br />.... <br />'" <br />I <br /> <br />36-BLACKWOD CREEK WATERSHED PROJOCT, NEBRASKA <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />Operational project in Hayes & Hitchcock Counties; <br />Republican R. dr,ainage; scheduled FY 88 completion; <br />features 13 flood retentIon structures; <br />cost $4.3 million. <br /> <br />37-CLA'IONIA CREEK WATERSHED PROJECT, NEBRASKA <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />Operational project in Gage & Lancaster Counties; <br />Big Blue drainage; scheduled completion FY 82; <br />features 8 flood retention structures; <br />cost $1.2 million. <br /> <br />................................................................................................................... <br /> <br />38-BEAR-PIERCE-CEDAR WATERSHED PROJB::T, NEBRASKA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation and Management <br /> <br />Operational project in Gage County; scheduled <br />completion FY 82; features 6 grade stab., and 27 <br />flood retention structures; cost $3.7 million. <br /> <br />............................................................................................................... <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.