My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05501
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:38 PM
Creation date
10/12/2006 1:04:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1980
Author
MRBC
Title
Missouri River Basin Water Resources Management Plan - Comprehensive Coordinated Joint Plan - Water and Related Land Resources - Final Environmental Impact Statement - Part II-Chapters 9-Appendices
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />18-UPPER DELAWARE AND TRIBUTARIES WATERSHED PROJ.EX:T, KANSAS <br />USDA/Soil Conservation Service <br />Flood, Land Conservation and Management <br /> <br />Project with application approved; planning auth- <br />orization anticipated FY 94; located in Atchison, <br />Brown, Jackson, and Nemaha Cos., includes 120 grade <br />stab. structures, cost $12 million. <br /> <br />................................................................................................................... <br /> <br />19-DRY CREEK WATERSHED PROJECT, KANSAS <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />Active planning underway; installation authori- <br />zation scheduled for FY 801 located in Clay, Cloud, <br />Republic, and Washington Cos.; features 3 flood ret- <br />ention structures~ cost $300,000. <br /> <br />Co <br />c;: <br /> <br />, .,~ <br /> <br />................................................................................................................... <br /> <br />".>. <br /> <br />20-ELK CREEK WATERSHED PROJ.EX:T, KANSAS <br />USDA/Soil Conservation Service <br />Flooding and Recreation <br /> <br />Active planning underway; installation authori- <br />zation scheduled for FY 801 located in Atchison, <br />Jackson, and Nemaha Cos.; features 70 grade stabiliza- <br />tion struc" I multipurpose struc.; cost $7.7 mill. <br /> <br />. . . . . . . ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> <br />21-GRASSHOPPER-COAL CREEK WATERSHED PROJ.EX:T, KANSAS <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />Active planning underwaYJ installation authori- <br />zation scheduled for FY 80, located in Atchison, <br />Brown, and Jefferson Cos.; features 39 grade <br />stabilization structures: cost $2.6 million. <br /> <br />................................................................................................................... <br /> <br />I <br />N <br />,... <br />.... <br />I <br /> <br />22-M)LF-WILDCAT CREEK WATERSHED PROJB::T, NEBRASKA <br />USDA/Soil Conservation Service <br />FlOoding, Land Conservation and Management <br /> <br />Active planning underway; installation authori- <br />zation scheduled for FY 80; located in Saline <br />Co.~ features 9 flood reten. structures; 12 grade <br />stab.; cost $1.7 million. <br /> <br />................................................................................................................... <br /> <br />23-SWAN CREEK WATERSHED PROJ.EX:T, NEBRASKA <br />USDA/Soil Conservation Service <br />Flooding, Land Conservation , Management, and Recreation <br /> <br />Active planning underway; installation authori- <br />zation scheduled for FY 801 located in Pawnee, <br />and Gage Cos., features 16 flood retention struc., <br />cost $4 million. <br /> <br />................................................................................................................... <br /> <br />24-CROSS CREEK WATERSHED PROJB:T, KANSAS <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />Project under construction; completion scheduled <br />FY 83; located in Jackson, Shawnee, and Pottawatomie <br />Counties, features 15 flood retention structures; <br />cost $4 million. <br /> <br />................................................................................................................... <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.