Laserfiche WebLink
<br />6-FOUR RIVERS RC&D AREA, KANSAS <br />USDA/Soil Conservation Service <br />Comprehensive <br /> <br />Ongoing feasibility study in eastern Kansas; annual funding <br />requirements are $50,000 FY 80; $40,000 FY 81; <br />$30,000 FY 82. <br /> <br />................................................................................................................... <br /> <br />7-KANSAS AND OSAGE RIVERS SWDY, KANSAS <br />Army Corps of Engineers <br />Comprehensive <br />Also in Lower Missouri Subbasin <br /> <br />Ongoing special study thru FY 831 streambank stab- <br />ilization on KS. R. , tribsl mineral pollution con- <br />trol in KS. R. basin, water supply and distribution <br />in KS. and Osage~ study cost $4,540,000. <br /> <br />................................................................................................................... <br /> <br />"-" <br /> <br />PLOODING <br /> <br />( <br /> <br />8-STRANGER. CREEK BASIN S'lUDY, KANSAS <br />Army Corps of Engineers <br />Flooding, Recreation, Municipal, Industrial & Rural Supply <br /> <br />Ongoing feasibility study of flood control alter- <br />natives for Stranger Creek basin in eastern Kan- <br />sas; structural , noostruc. considered I study <br />completion FY 821 study cost $590,000. <br /> <br />................................................................................................................... <br /> <br />9-0NAGA LAKE, KANSAS <br />Army Corps of Engineers <br />Flooding, Fish , Wildlife, Recreation, Water Supply <br /> <br />Preconstruction planning of dam and reservoir on Ver- <br />million Creek in E. Kan. to provide flood control, <br />water supply, reC.1 project completion not yet <br />determined I cost estimate $69.5 million. <br /> <br />I <br />N <br />,... <br />I.n <br />I <br /> <br />................................................................................................................... <br /> <br />10-CHANNEL GEOMETRY/DISCHARGE CHARACTERISTICS STUDY, KANSAS <br />DOl/GeOlogical Survey <br />Flooding <br /> <br />Ongoing special study to identify channel charact- <br />eristics of streams having dams; study completion <br />scheduled for FY 80; study cost $150,OOO~ cost- <br />shared with KS. Water Resources Board. <br /> <br />................................................................................................................... <br /> <br />