Laserfiche WebLink
<br />'. <br />I <br />I <br />I <br />I <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />., <br />II <br />I <br />I <br />,I, <br />I <br />I <br /> <br />M23S8 <br /> <br />Blue Mesa Powerplant contains two 43,200 kilowatt generators. <br />Water enters the powerplant through a gated intake tower located <br />on a shelf upstream of the dam. Waters are drawn from elevations <br />2,242 to 2,264 M. Except for hydrologic events which exceed the <br />powerplant capacity or emergency situations, water is released <br />through the powerplant to meet project purposes. Power <br />generation normally occurs 24 hours a day during the spring and <br />summer, however, during the fall and winter there are days when <br />no releases are made. <br /> <br />Ii <br /> <br />Soap Creek Arm <br /> <br /> <br />1 0 <br />11-1...... <br /> <br />2 <br /> <br />J <br /> <br />. <br /> <br />5 <br /> <br />6 <br /> <br />7 <br />, <br /> <br />SCAlf Of WIlES <br /> <br />o <br /> <br />Km <br /> <br />10 <br /> <br />Figure 1. General Map of Blue Mesa Reservoir. <br /> <br />5 <br />