Laserfiche WebLink
<br />0022n9 <br /> <br />. <br /> <br />. <br /> <br />1. Summary. The magnitude of flood control storage provided <br />in the Bureau of Reclamation reservoirs yas determined by the Corps <br />of Engineers, and the reservoirs are operated for flood control <br />purposes in accordance yith instructions from the Corps, In addi- <br />tion to the projects innumerated above, the existing Cambridge and <br />Superior-Courtland Dams are operated by the Bureau of Reclamation. <br />These dams are for irrigation diversion purposes only and do not <br />provide floodwater impoundments. The several Bureau of Reclamation <br />projects are shown on the Reference Map, and reservoir data are <br />summarized in table 5. <br /> <br />17 <br />