My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05493
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:35 PM
Creation date
10/12/2006 1:04:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8146.100
Description
Pueblo Dam - Project Description
State
CO
Basin
Arkansas
Water Division
2
Date
6/1/1964
Author
US DoI BoR
Title
Schedule General Provisions Specifications and Drawings - Initial Construction For Pueblo Dam
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />234t <br /> <br />CONTENTS-Continued <br /> <br />130. Concrete in Inlet and Outlet Structures for <br />Precast Concrete Pipe Culvert <br /> <br />Concrete Pipe: <br />131. Precast Concrete Pipe, General <br />132. Reinforced Concrete Pressure Pipe <br />133. laying Concrete Pipe <br />134. Curves for Concrete Pipe <br />135. Measurement and Payment of Precast Concrete <br />Pipe <br /> <br />Special Concrete Requirements: <br />136. Metal Seals <br />137. Polyvinyl.chloride {PVC\ Waterstops <br />138. Rubber Waterstop <br />139. Dowels <br />140. Preformed Bituminous-type Joint Filler <br /> <br />Metalwork, Gates and Equipment: <br />141. Drawings and Data to be Furnished by the <br />Contractor <br />142. Stoplogs, Trashracks, and Metalwork <br />143. Reservoir level Gage Piping <br />144. High-pressure Gates <br />145. High-pressure Gate Controls <br />146. Cast Iron Slide Gates <br /> <br />Metal Piping: <br />147. Metal Piping <br />148. Chain Link Fence <br />149, Pipe Culverts <br /> <br />Painting: <br />150. Painting Metalwork <br />151. Color Schedule for Painting <br /> <br />Drawings: <br />152. Drawings <br />
The URL can be used to link to this page
Your browser does not support the video tag.