My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05493
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:35 PM
Creation date
10/12/2006 1:04:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8146.100
Description
Pueblo Dam - Project Description
State
CO
Basin
Arkansas
Water Division
2
Date
6/1/1964
Author
US DoI BoR
Title
Schedule General Provisions Specifications and Drawings - Initial Construction For Pueblo Dam
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />2342 <br /> <br />CONTENTS <br /> <br />. <br /> <br />Bid Form (Standard Form 21) <br />Representations and Certifications (Standard Form <br />19B) <br />Certification of Nonsegregated Facil ities (Supplement <br />to Standard Form 19BI <br /> <br />. <br /> <br />Bidding Schedule <br />Schedule (a.f) <br />Mistakes in Bids <br />Representations by Bidder Pursuant to "Buy <br />American Act" <br />Notice of Requirement for Certification of <br />Nonsegregated Facilities <br /> <br />General Provisions (Standard Form 23AI (Clauses No. <br />T to 22) <br />Supplement to General Provisions and Labor Standards <br />Provisions <br />Labor Standards Pro,isions (Standard Form 19A\ <br /> <br />SPECIFICATIONS <br /> <br />. <br /> <br />General Conditions: <br />1. Bonds <br />2. Rights-of-way <br />3. Cleaning Up <br />4. Protests <br />5. Federal, State, and local Taxes <br />6. Safety and Health <br /> <br />" <br /> <br />Special Conditions: <br />7. The Requirement <br />8. Description of the Work <br />9. Rates of Wages <br />10. Funds Available for Earnings <br />11. Progress Payments <br />12. Quantities and Unit Prices <br />13. Contract Adjustments <br />14. Equipment Ownership and Operation Expense <br />15. Price Reduction for Defective Cost or Pricing <br />Data-Price Adjustments <br />16. Audit-Price Adjustments <br />17. Subcontractor Cost and Pricing Data-Price <br />Adiustments <br />18. Commencement, Prosecution, and Completion of <br />Work <br />19. liquidated Damages <br />20. Construction Program <br />21. Concrete Placement Schedule <br />22. Use of Construction Facilities <br />23. Staking Out Work <br /> <br />. <br /> <br />. <br /> <br />24. Inspection and Tests by Government <br />25. Backcharges to Co ntractor <br />26. Performance and Supervision of Work by <br />Contractor <br />27. Responsibility and Bonding of Subcontractors <br />28. Small Business Subcontracting Program <br />29. Cost Reduction Incentive (Value Engineering) <br />30. Colorado Sales and Use Tax <br /> <br />Materials: <br />31. Materials to be Furnished by the Contractor <br />32. Weights of Machinery, Equipment, and Metal <br />Parts <br />33. Materials and Workmanship <br />34. Reference Specifications and Standards <br />35. Right to Operate and Use Unsatisfactory <br />Materials or Equipment <br /> <br />Local Conditions: <br />36. Use of land for Camp and Construction <br />Purposes <br />37. Layout of Contractor's Plant <br />38. Access to the Work <br />39. Investigation of Site <br />40. Landscape Preservation <br />41. Prevention of Water Pollution <br />42. Original Cross Sections of the Damsite <br />43. Existing Fences <br />44. Existing Watercourses and Utility Crossings <br />45. Railroads, and Transmission, Telegraph, and <br />Telephone lines <br />46. Final Cleanup of Bessemer Ditch Outlet Works <br />Stilling Basin and Wave Suppressor <br />47. Dust Abatement <br />48. Safety Engineer <br />49. First.aid and Medical Facilities <br />50. Water for Construction Purposes <br />51. Construction and Foundation Materials Test <br />Data <br />52. Information as to Subsurface Investigations <br />53. Right to Change location and Plans <br />54. Safety of the Public <br />55. Public Traffic in the Construction Area <br />56. Electric Power for Construction Purposes <br /> <br />Diversion and Care of Water <br />During Construction and Removal <br />of Water from Foundations: <br />57. Diversion and Care of River During Construction <br />and Removal of Water from Foundations <br />
The URL can be used to link to this page
Your browser does not support the video tag.