Laserfiche WebLink
<br />. <br /> <br />'- <br /> <br />. <br /> <br />, <br />I' <br />f <br />II <br />'I <br />I <br />I <br /> <br />. <br /> <br />. <br /> <br />.. <br /> <br />\ <br />'I <br /> <br />. <br /> <br />....jI'l\Gt"\ <br />i:. J 1';\:-31 (10-69) <br />Bur'~au of Reclilmalion <br />(Construction) <br /> <br />GENERAL CONDITIONS <br /> <br />SPECIFICATIONS <br /> <br />RIGHTS-OF-WA Y <br /> <br />1. BONDS <br /> <br />a, Bid guarantee.-The bidder shall furnish <br />guarantee V'Jith each bid in an amount not less than <br />20 percent of the amount of the bid: Provided, That <br />guarantee in excess of $3,000,000 will not be <br />required. (See Standard Form 22, Instructions to <br />Bidders.) <br /> <br />b. The contractor shall furnish bonds as follows: <br /> <br />(1) Performance bond with approved su rety. or <br />sureties, and with a penal amount equal to 100 <br />percent of the contract price at the time of <br />award. <br /> <br />(2) Payment bond.-If the amount of the <br />contract exceeds $2,000, the contractor shall <br />furnish to the United States, in addition to the <br />bond required under b.ll) hereof, a payment <br />bond with a surety or sureties satisfactory to the <br />officer awarding the contract, {Ot" the pt"Otection <br />of all persons supplying labor and material in the <br />prosecution of the work provided for in the <br />contract, for the use of each such person. <br />Whene-.Jel' the tota\ amount pavab\e by the terms <br />of the contract shall be not more than <br />$1,000,000, the payment bond shall be in the <br />sum of one-half of the total amount payable by <br />the terms of the contract. Whenever the total <br />amount payable by the terms of the contract <br />shall be more than $1,000,000 and not more <br />than $5,000,000, the payment bond shall be in <br />the sum of 40 percent of the total amount <br />payable by the terms of the contract. Whenever <br />the total amount payable by the terms of the <br />contract shall be mOle than $5,Q()(},Q()(}, the <br />payment bond shall be in the sum of $2,500,000. <br /> <br />c. Requirements for execution of surety <br />bonds.- Each su rety company bond (bid, <br />performance, payment), which purports to have <br />been executed by an agent or attorney.in-fact for <br />the corporate surety. is required to have submitted <br />with it a power of attorney to the signatory agent or <br />attorney-in-fact, and executed by the corporate <br />surety upon a date reasonably proximate to the date <br />of the bond, or the power of attorney shall be <br />accompanied by a certification of the surety to the <br />effect that the power of attorney was in fu II force <br />and effect upon a date reasonably prox imate to the <br />date of the bond. <br /> <br />2. <br /> <br />The Government will provide the right-of.way or the <br />site for permanent works or installations, the site for <br />borrow pits, channels. spoil banks, and ditches, and <br />right.of-way for accesS thereto over routes established <br />by the contracting officer. The contractor will be <br />permitted to use such land for construction purposes, <br />but any additional right-of-way or land desired by the <br />contractor for construction purposes shall be provided <br />by the contractor without expense to the Government. <br /> <br />3. CLEANING UP <br /> <br />Upon completion of the work the contractor shall <br />remove from the vicinity of the work all plant, <br />buildings, rubbish, unused materials, concrete forms <br />and other like material, belonging to him or used under <br />his direction during construction. All work areas shall <br />be graded and left in a neat manner conforming to the <br />natural appearance of the landscape and as provided <br />elsewhere in these specifications. In the event of the <br />contractor's failure to do so the same may be <br />~rfofmed by the Government, at the expense of the <br />contractor, and his surety or sureties shall be liable <br />therefor. <br /> <br />'I. PROTESTS <br /> <br />If the contractor disagrees with any direction, <br />instruction, interpretation, or determination of the <br />contracting officer, his authorized representative or the <br />inspectors, he shall immediately upon the making of <br />such direction, instruction, interpretation or <br />determination, ask, in writing, ior written instructions <br />from the authorized representative. After the filing of <br />his written protest he shall proceed without delay to <br />perform the work in accordance with the direction, <br />instruction, interpretation or determination. In <br />addition, he shall fully comply with the written notice <br />provisions of the General Provisions clause entitled <br />"Changes." Directions, instructions, interpretations or <br />determinations of the contracting officer or his <br />authorized representative contained in letters <br />transmitting drawings to the contractor shall be <br />considered as being subiect to protest as herein <br />provided. <br /> <br />5. FEDERAL, STATE, AND LOCAL TAXES <br /> <br />a. Except as may be otherwise provided in this <br />contract, the contract price includes all appJ icable <br />Federal, State, and local taxes and duties. ,. <br /> <br />.1 <br />