Laserfiche WebLink
<br /> .-.....40 <br /> .:::.:) 0 BIDDING SCHEDULE FOR <br /> SPECIFICATIONS NO, DC-6820 <br /> . SCHEDULE-Continued <br /> Item Work or material Quantity and unit Unit price Amount <br /> 25 Procuring and placing bedding for <br /> riprap 1,500 cu yd $ $ <br /> 26 Surtacing for service road 220 cu yd <br />. <br /> 27 Mobilization and demobilization <br /> ior drilling and grouting For the lump sum of <br />. Drilling grout holes in stage <br /> between the depth, of: <br /> 28 o and 30 feet 35.000 lin ft <br /> 29 30 and 60 feet 15,000 lin ft <br /> 30 60 and 110 feet 12,000 lin It <br /> 31 Furnishing and placing metal pipe <br /> and fittings for foundation <br /> grouting and drainage 24,300 pound, <br /> 32 Hookups to foundation grout holes 1,165 hookup, <br /> 33 Pressure grouting foundations 52,500 sack, <br /> . 34 Furnishing and installing metal <br /> tubing and fittings for diver- <br /> sion conduit grouting system 4,100 pound, <br /> Furnishing the following sizes of <br /> perforated sewer pipe and con. <br /> structing drains: <br /> 35 4.inch diameter 150 lin ft <br /> 36 6.inch diameter SOlin ft <br /> 37 Furnishing and laying asbestos. <br /> cement nonpressure sewer pipe 180lin It <br /> 38 Drilling holes for anchor bars <br /> and grouting bars in place 440 lin It <br /> 39 Furnishing and handling cement <br /> meeting the requirements of <br /> Federal Specification SS-C-1929 <br />. for Tvpe V ,low alkali 9,750 barrel, <br /> 40 Furnishing and handling Type II, <br /> low-alkali cement except for <br /> grouting 21 ,I 00 barrel, <br /> . 41 Furnishing, and handling sacked <br /> cement for grouting foundations 52,500,ack, <br /> <br />c <br />