My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05493
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:35 PM
Creation date
10/12/2006 1:04:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8146.100
Description
Pueblo Dam - Project Description
State
CO
Basin
Arkansas
Water Division
2
Date
6/1/1964
Author
US DoI BoR
Title
Schedule General Provisions Specifications and Drawings - Initial Construction For Pueblo Dam
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />.. <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />~34"i' <br /> <br />INITIAL CONSTRUCTION <br />FOR PUEBLO DAM <br /> <br />FRYINGPAN-ARKANSAS PROJECT, <br />COLORADO <br /> <br />BIDDING SCHEDULE FOR <br />SPECIFICATIONS NO. DC-6820 <br /> <br />Bids will be considered on the following schedule, but no bid will be considered for only a part of the schedule. <br /> <br />All bids are subject to the provisions contained in the attached Bureau of Reclamation Form 7-1746 entitled <br />"Mistakes in Bids." <br /> <br />Item <br /> <br />Work or material <br /> <br />Diversion and care of river <br />during construction and removal <br />of water from foundations <br /> <br />2 <br /> <br />Maintenance of flow in Bessemer <br />ditch during construction <br /> <br />3 <br /> <br />Clearing <br /> <br />4 <br /> <br />Excavation, common, for concrete <br />plug <br /> <br />5 <br /> <br />Excavation, rock, for concrete <br />plug <br /> <br />6 <br /> <br />Excavation, common, for concrete <br />dam <br /> <br />7 <br /> <br />Excavation, rock, for concrete <br />dam <br /> <br />8 Excavation, all classes, for <br />stilling basin and outlet <br />cheRnel : <br /> <br />a. First 280,000 cu yd <br /> <br />b. Over 2BO,OOO cu yd <br /> <br />9 <br /> <br />Excavation, all classes, for Hamp- <br />Bell ditch temporary headworks <br /> <br />10 Excavation, all classes, for <br />earth dam embankment foundation: <br /> <br />a. First 510,000 cu yd <br /> <br />b. Over 510,000 cu yd <br /> <br />11 <br /> <br />Removal of concrete in wingwatl <br />and Bessemer ditch conduit <br /> <br />SCHEDULE <br /> <br />Quantity and unit <br /> <br />Unit price <br /> <br />F or the lump sum of <br /> <br />For the lump sum of <br /> <br />For the lump sum of <br /> <br />30,000 cu yd <br /> <br />11,000 cu yd <br /> <br />9,000 cu yd <br /> <br />84,600 cu yd <br /> <br />280,000 cu yd <br /> <br />145,000 cu yd <br /> <br />10 cu yd <br /> <br />510,000 cu yd <br /> <br />280,000 cu yd <br /> <br />$ <br /> <br />For the lump sum of <br /> <br />a <br /> <br />Amount <br /> <br />$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.