Laserfiche WebLink
<br />. <br /> <br />.. <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />~34"i' <br /> <br />INITIAL CONSTRUCTION <br />FOR PUEBLO DAM <br /> <br />FRYINGPAN-ARKANSAS PROJECT, <br />COLORADO <br /> <br />BIDDING SCHEDULE FOR <br />SPECIFICATIONS NO. DC-6820 <br /> <br />Bids will be considered on the following schedule, but no bid will be considered for only a part of the schedule. <br /> <br />All bids are subject to the provisions contained in the attached Bureau of Reclamation Form 7-1746 entitled <br />"Mistakes in Bids." <br /> <br />Item <br /> <br />Work or material <br /> <br />Diversion and care of river <br />during construction and removal <br />of water from foundations <br /> <br />2 <br /> <br />Maintenance of flow in Bessemer <br />ditch during construction <br /> <br />3 <br /> <br />Clearing <br /> <br />4 <br /> <br />Excavation, common, for concrete <br />plug <br /> <br />5 <br /> <br />Excavation, rock, for concrete <br />plug <br /> <br />6 <br /> <br />Excavation, common, for concrete <br />dam <br /> <br />7 <br /> <br />Excavation, rock, for concrete <br />dam <br /> <br />8 Excavation, all classes, for <br />stilling basin and outlet <br />cheRnel : <br /> <br />a. First 280,000 cu yd <br /> <br />b. Over 2BO,OOO cu yd <br /> <br />9 <br /> <br />Excavation, all classes, for Hamp- <br />Bell ditch temporary headworks <br /> <br />10 Excavation, all classes, for <br />earth dam embankment foundation: <br /> <br />a. First 510,000 cu yd <br /> <br />b. Over 510,000 cu yd <br /> <br />11 <br /> <br />Removal of concrete in wingwatl <br />and Bessemer ditch conduit <br /> <br />SCHEDULE <br /> <br />Quantity and unit <br /> <br />Unit price <br /> <br />F or the lump sum of <br /> <br />For the lump sum of <br /> <br />For the lump sum of <br /> <br />30,000 cu yd <br /> <br />11,000 cu yd <br /> <br />9,000 cu yd <br /> <br />84,600 cu yd <br /> <br />280,000 cu yd <br /> <br />145,000 cu yd <br /> <br />10 cu yd <br /> <br />510,000 cu yd <br /> <br />280,000 cu yd <br /> <br />$ <br /> <br />For the lump sum of <br /> <br />a <br /> <br />Amount <br /> <br />$ <br />