Laserfiche WebLink
<br />U U 1:.1.1 ~' <br /> <br />Commitlce will evaluate and synlhe,izc thc results of both the specific-problem aJlalysis <br />and the nationwide an~dysjs for use in [be remaining l1atio!l~ll priorities :ll1alysis [lctivitit:s. <br /> <br />. <br /> <br />. <br /> <br />The evaluatiou will foclIs upon the following tasks: <br /> <br />o Determining the l1l'cd for and acquiring additional information to de~cribc~ from <br />a nation a! viewpoint, pfLlb\cms t\1at were previously identified but not adequately <br />described. <br /> <br />" <br /> <br />Identifying ;]nd describing, from thl' national viewpoiJlt, additioJlJI problems <br />th;]t previously had not become apparent in either the specific-problem amlysis <br />or the nationwide analysis. <br /> <br />o <br /> <br />J)~\'elopillg all illlli:d sd of eomn.cnts on th..::: illrorm~llion~ priorities, and conclu- <br />sions and rccol11mcll(:~tioJls contained in the regional report for 1158 in the re- <br />maining national priorities analysis activities. <br /> <br />o Compiling Clnd displaying a range or national and regional assumptions and rutui"t..:- <br />condirion requircll1L'nts illcluding all NPA Committee recommended set for <br />consiuerJtictll in Activity Two. <br /> <br />Q Compiling and displaying the remaining informalion which describes tbe probl21~)S <br />to be cv:J!liatcd in Actil'ity Two as ""tioml priorities are established. <br /> <br />Preimplcnh~i1Llf10n 1:15KS jll\'OJ\'C csti.Jblbhil1~ W!J[lf inform;Jtion will be cVi.\lui.J.ted in this <br />activity, what i"forl11atio1\ will ,'csellt al1l1 how L'vl\1 will be displayed. <br /> <br />/lelil';I." '/"11'0. Eslablislul/(J!1 of ,vi/lioJ!al Priori/in. (October 1976-DcccmGer I 97()J <br />This ~lctivity will result in the csublishlllcnt 0: a sc.:t or prioriti'2s for resolving the probleJP~ <br />described 2ml disp';lyed in Ad;\'it/ One. This is ;lccc\lnplishcd by ti,e follo'.ving tosks: <br /> <br />, <br /> <br />J. <br /> <br />o Sl'iccting 8 task force to establish national priorities. The task force will be <br />selected by the COllllcil from:! list of potcntial participants recommended by both <br />tlIe COLl!lcii Jncl th~ rcgionz11 sponsors. <br /> <br />G <br /> <br />Selecting 113tiona! and regional assumptions 3nd requirements UpOI1 which tht~ <br />national priorities \\'ill be based. This will be accomplished by the t~sk forCe <br />upon c\'<lluating the r:.H1ge of assumptions and requirements developed in Activity <br />One. <br /> <br />o <br /> <br />btablislJing anel displaying ,,"tion:1I priorities for the identified problems based <br />upon the assumptions 3nd requirements selected in the second task above. This <br />will bc done by the t:isk force upon el'aluating the information pro\"idt'd by <br />Activity One. As in the specific-probk'lll an:llysis, priorities will be dcveloped for <br />two time periods, \975 to 1985 and \985 \02000. <br /> <br />Preimplemcnt:ition tasks include dcvelupin~ the procedures that will be used to select <br />the task force. i.J.nd tile gLlid(,\in~s foj' the task furc:c, as it c\'alu:Jlcs the results of Activit~1 <br />One and c~tubJ\shcs :.l'Ml displays jl<niona\ r,r:o~'itjl.:s. <br /> <br />25 <br />