My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05449
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:23 PM
Creation date
10/12/2006 1:02:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1948
Author
DOI
Title
The Interior Department in the Missouri Basin - Progress Report 1948
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />",ill require roservoirs on tho main stream, on some of the tributaries, <br />and along canal lines. At the closo of the year the Basin studies <br />ucro reported to be 31 percent complete. Costs durf~g tho year 1~erc <br />~~87 , 027 . <br /> <br />NORTH PLATTE RIVER BASIN(l21 <br /> <br />Prorra."1 05~.000: Although the North Platte Rivor Basin has a <br />larger proportion of its uatcr resources developed than any othor part <br />of the Platte Basin thoro arc a fO\-l r.rl.nor possibili tics 1vhich roquire <br />study and i~vcstigation bofore the final plan can be considcrcd complete. <br /> <br />Very little 110rk l-laS done on the basin-1vide investigation during <br />tho year due to a shortage of personncl, but a rcconnaissancc classi- <br />fication of 34,000 acros in the Saratoca area, 23,000 acros in the <br />North Park arQa and 65,000 acres in the Sweetwater area lIas accom- <br />plished. Basin-Hide studios Hcro ro~orted as 20 porccnt complete at . <br />tho close of the year. Costs llorc ~39,101. <br /> <br />GARRISON DIVERSION UNIT(17) <br /> <br />Prorzral'l (:>50,000: This invoiJti.cation covers an area adjacent to <br />tho Garrison Reservoir nOli und'l3r construction by tho Corps. of Enginoers. <br />It uas not included in t.ho plans described in S. D. 191. The construc- <br />tion of Garrison Resorvoir may nal:o it feasiole to irriGate several <br />hundrod thousand acres in this area after the level of the russouri <br />River has been raiscd by i;-:lpounfu1ent in Garrison Reservoir. Prclim- <br />inaI"'J l1or!{ is boin~: dO~lC to dctomi:1o the feasibility of such a plan. <br />A block arca .for L1tensivc surve~rs and land classification Has selocted <br />in January 19l~C but the crCHS on this vlork Hero 1Ii thdral-In in Harch <br />because of thc urgent need for them on other uork. In April l!ork uas <br />resu.."'led but this ti:".lC 1"i th forces furnishec1 u...'1der a cooperative agrec- <br />ment by the North Dakota Water Conservation Board and under tho super- <br />vision of Bureau .cngineers. - Tho block _ area "as not completod. Costs <br />1-IOro ::~36,3l3. -.....-- <br /> <br />." <br /> <br />-I <br />I <br />, <br /> <br />~~mSTa~N RESERVOIR(29) <br /> <br />Pro~r'im )5.000: The Jamostol<1n Reservoir is a feature of the <br />Hissouri-Souris Unit in North Dal:ota. A small portion of the reser- <br />voir ,,,as surveyed aad fctail to'IJor:ra'IJh'T mis -takon on 125 acres sur- <br />rounding tho damsitc. Coots Hcro....~2:476. <br /> <br />KNIFE RIVER UilTIT(lS) <br /> <br />..., <br /> <br />Pror~rar:1 ~10 .000: Progrcss rcports make no commcnt on investiga- <br />tions on this wli t oxcopt that the geologic roport on the Broncho dam- <br />site was prepared. Costs 1mro ~7,630. <br /> <br />62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.