<br />During June contracts were awarded for the following:
<br />Unit or Pro1ect ~.
<br />
<br />..."s,urs-C:2J2
<br />22!l4
<br />
<br />0000?2
<br />
<br />Belle Fourche
<br />
<br />2246
<br />
<br />CONSTRUJTION Sm::IPICATIONS
<br />
<br />Brief Deooriution
<br />
<br />Two air OalllpnlBsors tor outlet oontrol at. Angostura. DI!IlD., Worthington Pump & Machina1'1 Corp. J
<br />Harrl.lIOn, Nev Jersey_ $1,566 fob Holyoko, Hass.
<br />
<br />132,500 'barrels Portlard eemBnt for Angostura Dam, Universal A.tlas Cement Co., Chicago,
<br />Illinois. .324,6.25 fob Universal, Pe.
<br />
<br />Furnishing ard oreeting 10 prefab t'99idences for Ke;:ybole cap, Brozlca COD:!!ItnlCtlon Co.,
<br />Rapid City, South Dakota. $94,300.
<br />
<br />Traveling crane for Gove~nt warehouse, Harnioohf"eger Corp., M1lvauklM, WIBCoMin.
<br />$9,020 tob MUwau.'kee.
<br />
<br />2200 Twlw t1'Bl!lhraoks for intake stl"'W:lture at Granh," Pumping P1!Ult, Pao1.tlc Coast Engineering
<br />Co., A.hIllBda, Callforc1a. t6.Jao fob Alameda.
<br />
<br />Canyon Feny
<br />
<br />2179
<br />
<br />2208 Five radial gates s.n:l hoista for spillway at OlympI.UI D8111., Pao1fic COBst Engireering Co.,
<br />Al&lll!lda, California. .30,430 fob Ale.meda.
<br />
<br />:uJ.S 1\10 gate frames for canal intake at CUympue Dem, Schmitt Steel Co., Portland, Oregon.
<br />12,785 fob Port.1and.
<br />
<br />Colo.-Big Thompson
<br />
<br />2222
<br />
<br />222.3
<br />
<br />22.38
<br />
<br />2258
<br />
<br />-C:09
<br />P'retlQhman-Cl!lIIIbrld
<br />R7-15
<br />
<br />Gram Riwr
<br />
<br />2201
<br />
<br />Moorhead
<br />
<br />2138
<br />
<br />R6-RP-12
<br />
<br />R6-RP-14
<br />
<br />Hi venon
<br />
<br />~RP-15
<br />
<br />2135
<br />
<br />Shoshone
<br />
<br />2180
<br />
<br />TnnsmllUlion tinsll 2171
<br />
<br />'rYo gates for oanal. intake at Olympus Dam, Pacific Coast;. EngineeriD@: Co., Al.8lIl8da,
<br />California. 83,970 fob Al.&mI!!Ida.
<br />
<br />Gates ar.d m1scellanoous equiJIIISnt for Olympus. DlI1ll, Ilorthwst Marine Iron Workll, Portlard,
<br />Oregon. $8,248 fob Portland.
<br />
<br />Trashracks for outlet works at Granby OM, Standard Steel Corp., Los Angeles, California.
<br />tJ,,608 fob Los Angelu.
<br />
<br />Material tor one steal varehoulle at Wild's Spur, Colorado, American Bridge Co., Denver,
<br />Colorado. 831,m tob Wild's Spur.
<br />
<br />ODe 44T1 diamter outlet pipe for HediciIIB Creek Om, Thompson Pipe am Steel Co., Denver,
<br />Colorado. 89.465 fob Denver.
<br />
<br />Telephone By"stem from C_brideo to Medicine Creek D8III, C. F. Lytle Co. and AmiB Construction
<br />Co., Cambridge. Nebraeka. 83,913.
<br />
<br />Constmction at access road at ShadehUl Dam, Fog~ & Holzvorth Constrmtlon Co., Milss City,
<br />Hontana. tJ,O,741.
<br />
<br />Fourteen prefab residences for GowrnlllBnt cemp, Levis Conetruction Co., BUlingll, Montana.
<br />tl48,574.
<br />
<br />Prepere.tion of concrete aggregates at Krump deposit, Gilpatrick Construction Co., Riverton,
<br />_ng. t94,580.
<br />
<br />Painting buildings at Goftll"Illltmt CSJ:lpS, Wlldgrobe Decorating Co., IDe., .Denver, Colorado.
<br />$1.4,002.
<br />
<br />COD.strmting monolithio concrete sUlevalkll tor GoTen:lDent oamp at Hiverton, J8!Il8S I. Teter,
<br />Riverton, Vyalling. t4,Sll.
<br />
<br />Radia1-gate hoiets for Wyoming Canal, Monarch Forge &: Maohine Works, Portland, Oregon.
<br />t4,912 fob Portland.
<br />
<br />Radial gates tor Wyum1ns Canal, Valle:y Iron Works, Yakima, Washington. $4,558 fob YaJdlll8.
<br />
<br />Construction of earthwork am cooorete chute for Willwood Canal, Sharrock and Pursel,
<br />Casper, W:yoming. t46,735.
<br />
<br />Transformers for SidDllY substation, W8etinghouse Electric Corp., Denver, Colorado.
<br />tJ',242 tob Sid[ll!!l:Y, Nebraska.
<br />
<br />l'ransfol'lDl!lr for Sidney lIubstation, All1~halmer8 Mfg. Co., Del1V'l!lr, Colorado. $343 fob
<br />Sidns:y, Nebraska.
<br />
<br />Total value of contracts awarded during June: t862,459
<br />
<br />51
<br />
|