Laserfiche WebLink
<br />C\J <br />"'-.oj <br />l!') <br /> <br />TABLE OF CONTENTS <br /> <br />5.13.3 <br />5.13 .4 <br /> <br />Craig to Rifle Transmission Line <br />Wolcott to Mt. Elbert Transmission <br />Line <br /> <br />Page <br />259 <br /> <br />261 <br /> <br />5.14 Alternate Methods of Transmission <br />Construction <br /> <br />265 <br /> <br />5.14 .1 <br />5.14.2 <br />5.14.3 <br /> <br />Underground Construction <br />Use of Helicopters <br />Other Types of Structures <br /> <br />265 <br />268 <br />269 <br /> <br />6.0 Relationship between Local Short-Term Uses of )lan' s <br />Environment and the Haintenance and Enhancement of <br />Long-Term Productivity 271 <br /> <br />7.0 Irreversible and Irretrievable Commitment of <br />Resources 273 <br /> <br />Attachment <br /> <br />Environmental Analysis entitled "Yampa Project" submitted <br />by Colorado-Ute Electric Association, Inc., Platte River <br />Power Authority (formerly Platte River '1unicipal Power <br />AssociationJ, Salt River Project Agricultural Improvement <br />and Power District. Tri-State Generation and Transmission <br />Association, Inc., and Utah International Inc. <br />