Laserfiche WebLink
<br />000109 <br /> <br />development plan. <br /> <br />The Federal Power Commission is now at work on a second volume <br />of their study in which th~y propose to further analyze the potential <br />requirements and determine to IIhat extant they may be expected to be <br />met by proposed additional capacity. <br /> <br />The map on the following paee sholls types of power producing <br />facilities and transmission lines in the Basin. The map also indi- <br />cates those that ere publicly owned, privately o\olned or Federally <br />o~med. Also shown ere charts compiled from Federal PO\Jer Commission <br />data on present and future pO\Jer requirements. <br /> <br />., <br /> <br />57 <br />