Laserfiche WebLink
<br />~- <br />I <br /> <br />-....=~1 <br /> <br />.. <br /> <br />_...~' <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />... <br /> <br />- <br /> <br />- <br />- <br /> <br />- <br /> <br />- <br /> <br />-1 <br /> <br />TABLE 2 - ESTIMATED STRUCTURAL COST DISTRIBUTION <br /> <br />o <br /> <br />r ' <br /> <br />Limon Watershed, Colorado <br /> <br />~ <br />--.] <br />0) <br />CD <br /> <br />(Dollars) }) <br /> <br />1 Installation Cost - P. L. 566 FundFl i Instal. Cost-Other Fund~_ <br /> Instal~serVice1 Total Other -- I Total Total <br /> , ' <br />Structure Site . i Engin- P.L. Adm. Of Easf- Installation <br />Number or Name Construction eerina Other 566 t~~g;:s l~egl~ i Other Co"t <br />Floodwater-Retarding structures I I <br />1-1 68,972 9,656 9,656 I 88,284 450 I I 3.950 92,234 <br /> 3,500 i <br /> , , I <br />L-2 46,939 I 6,572 6,571 60,082 450 I 1,623 ' 2,073 62,155 <br /> 42,006 5 881 5 881 53 768 450 ! Q17 1 387 ';s. , ss <br />L-3 -- <br />TOTAL 157,917 22,109 ! 22,108 \ 202,134 1,350 i 6,060! 7,410 i 209,544 <br /> <br />11 Price Base: 1962 <br /> <br />Date: September 1962 <br /> <br />.~ <br />'" <br />