Laserfiche WebLink
<br />,.... <br />00 <br />,.... <br />to <br /> <br />Assumptions <br /> <br />. Minute 242 is currently being met at the SIB. <br /> <br />. Target salinity is approximately 1,200 ppm. <br /> <br />. Reduce variations in salinity. <br /> <br />. In order to improve the salinity at SIB, Mexico should be <br />willing to accept slightly higher levels at NIB. <br /> <br />. This is a long-term solution to SIB salinity situation. <br /> <br />. Deliver up to 140,000 acre-feet to Mexico at SIB. <br /> <br />. Looked at potential salinity increases in the future (ground <br />water, Colorado River, etc.). <br /> <br />. No additional Colorado River system water will be used to <br />improve the salinity of flows at the SIB. <br /> <br />. Limit the amount of water diverted to the Bypass Drain <br />from the BPP. <br /> <br />~~.""'"'~ <br />.. <br />~~ ., <br /> <br />dlnI9000wploverhead\slbproh1.revlstorklcf:11/09198 <br /> <br />-.' " ~ <br />