My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05396
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:10 PM
Creation date
10/12/2006 12:59:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
2/1/1963
Author
USBR
Title
Cache La Poudre Unit - Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~.f <br /> <br />l <br /> <br /> <br />. <br /> <br />CACHE LA POUDRE UNIT - COLORADO <br />REXJONNAISSANCE REPORT <br />February 1963 <br /> <br />"' <br />I <br /> <br />U.S.B.R. <br /> <br />Summary <br /> <br />2':'lkl;",." CM"., I II.!/>?,"~ /b"? <br />~"""(f",, ~ncl"..1 ~Qt)b" ;.. <br />Cache La Poudre Unit considered <br /> <br />The Bureau I s Reconnaissance Report for the <br /> <br />construction of a 180,000 a. f. reservoir at Idylwild site in upper Cache La Poudre River <br /> <br />with a power unit and afterbay, a 220,000 a. f. reservoir at the Grey Mountain site below <br /><:U1rtd",.! u,.,J /"<<"...- {'IQ07/_ <br />the mouth of the North Fork of the Poudre with a foreba:y and power caFft<,4"\ II ..,.. he <br />7h. .1dy/w>'l J. po",,.,, cQr"""1y e.;Dc//,f I, e /'l <br />1/ 24,00 K.W. and the Grey Mountain 250,000 K. W. The total project cost would be $111,108,000 <br /> <br />with the power costs amounting to $88,342,000. ( n -;;'.\> Of l"'dU. c~,il <br /> <br />Because of a very low planffactor, the Commissioner of Reclamation instructed <br /> <br />Region 7 to request authorit,y for initiation of a feasibility investigaticn of a first <br /> <br />stage of development consisting of the Idylwild Dam and Reservoir with minimum provisions <br /> <br />for future power development if future studies indicate they are feasible. <br /> <br />Since the Reconnaissance Report deals primarily with the Unit Plan, and only <br /> <br />minor information is given on the initial plan, it is difficult to follow portions of the <br />report with regard to the initial plan of development. '!he initial plan of development will <br /> <br />yield the same amount of M & I water as in the Unit Plan and 85% of the irrigation water. <br /> <br />The essential facts are presented below in tabular form. <br /> <br />Total <br /> <br />169,000 A. F. <br />11,000 A. F. <br /> <br />180,000 A. F. <br /> <br />290' high <br />1,700 acres <br />27,000 c.f.s. <br /> <br />Idylwilde Res. - Active Storage <br />Inactive Storage <br /> <br />Idylwilde Dam - Earth & Rock fill <br />W. S. area at max. <br />Spillway capacit,y <br /> <br />~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.