My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05393
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:10 PM
Creation date
10/12/2006 12:59:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.40
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
1/1/1981
Title
Report of the Civil Works Activities of the Albuquerque District Corps of Engineers in the Rio Grande Basin During Calendar Year 1980
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /><:"1 <br />Lt') <br />;.() <br />ro1 <br />C. <br /> <br />. <br /> <br />. <br /> <br />'"-, <br /> <br />Department of the Army <br />Albuquerque Distriet Corps of Engineers <br />P.O. Box 1580 <br />Albuquerque, New Mexico 87103 <br /> <br />Report of the Civil Works Activities of the Albuquerque <br />District Corps of Engineers, in the Rio Grande Basin <br />During Calendar Year 1980 <br /> <br />1. 'GENERAL. During Calendar Year 1980, the Civil Works Activities of the <br /> <br /> <br />Albuquerque District in the Rio Grande Basin consisted of construction, <br /> <br /> <br />preconstruction planning and related purposes, water control, and providing <br /> <br /> <br />flood plain management services to other concerned governmental agencies. <br /> <br />2. PLANNING. <br /> <br />a. Abiquiu Dam. During calendar year 1980, efforts of the Abiquiu <br /> <br /> <br />Reallocation/Rio Chama study were directed toward formulation of alternatives <br /> <br /> <br />for water supply, flood control, hydropower, recreation, fish and wildlife, <br /> <br /> <br />irrigation, and inereased channel capacity. The increased channel capacity <br /> <br /> <br />alternative in the Rio Chama will address the feasibility of providing a <br /> <br /> <br />4,000 c.f.s. channel. Meetings were held with the National Weather Service <br /> <br /> <br />regarding revised probable maximum snowpack for the Rio Chama above Abiquiu <br /> <br /> <br />Dam. As a result, it was determined that the spillway at Abiquiu Dam should <br /> <br /> <br />be enlarged to safely pass the revised probable maximum flood. Also, an <br /> <br /> <br />analysis was performed to determine the future water supply needs for <br /> <br /> <br />Albuquerque, Los Alamos, Santa Fe, Espanola, and Bernalillo. Preparation of <br /> <br /> <br />the Stage 2 Document reporting the results of alternative formulation <br /> <br /> <br />continued. <br /> <br />b. Rio Puerco - Rio Salado. Under authority of the Water Resources <br /> <br /> <br />Development Act of 1976, we are conducting Phase 1 of Advanced Engineering <br /> <br /> <br />and Design for possible water resource development on the Rio Puerco and the <br /> <br /> <br />Rio Salado. Needs and opportunities being addressed are reduction of floods <br />
The URL can be used to link to this page
Your browser does not support the video tag.