Laserfiche WebLink
<br />'... - <br /> <br />,lit;,.",'..,' <br />. ,t . I <br />. . . ,', .'.... <br />. ',' ':" '. <br /> <br />Plan I <br />SUMMARY SHEETS (Continued), <br /> <br />'ESTIMATED COSTS <br /> <br />, Total construction costs. . . <br />Interest during construction . <br />Annual operation, maintenance, <br />coats (1968-70 prices) . . . <br /> <br />". . . . . . . . <br /> <br />. . . . . . <br /> <br />"snd replacement <br /> <br />" . . . . <br /> <br />BENEFIT-COST ANALYSIS (IOO-year period of analysis) <br /> <br />Average annual benefits <br />Industrial, municipal, and dOlll! etic use <br />Irrigation ... <br />Recreation . . . <br />Fish and wildlife <br />Flood control . . . <br />Total '. '. <br />Less benefits lost in reservoir basins <br />Net benefits . . . . . . . <br />Average, annual equivalenc coats (5 1/2 percent interest. <br />,Bcnefit-cbst racio . . . . . . . . <br /> <br />. . <br /> <br />. . . . <br /> <br />( <br />I <br /> <br />2 <br /> <br />'. <br /> <br />$1,9,805,000 <br />5,3913,000 <br /> <br />114,100 <br /> <br />. <br /> <br />$4,87/.,500 <br />612,900 <br />245,800 <br />137,700 <br />11 ,000 <br />5,881.900 <br />9,900 <br />5,872 ,000 <br />4,135,700 <br />1.42:1 <br />